Case Studies
    ANDOR
  • (2)
    ANDOR
  • (2)
    ANDOR
  • (1)
  • (1)
    ANDOR
  • (1)
  • (1)
  • (1)
    ANDOR
  • (2)
    ANDOR
  • (2)
2 case studies
Case Study missing? Just let us know via Add New Case Study.
Sort by:
E.ON Gets Faster, Lower Cost Cycles with OpFlex Solutions
E.ON Gets Faster, Lower Cost Cycles with OpFlex Solutions
E.ON's plants ran 4000+ hours per year, now see fewer than 1000+ hours of profitable operation. E.ON needed a fast, reliable and low-cost cycle plants.
Download PDF
American Eagle Achieves LEED with GE LED Lighting Fixtures
American Eagle Achieves LEED with GE LED Lighting Fixtures
American Eagle Outfitters (AEO) was in the process of building a new distribution center. The AEO facility management team decided to look at alternate options for lighting layout that could provide energy and maintenance savings. AEO would need a full-time maintenance employee just to replace burned-out fluorescent tubes.
Download PDF
test test