技术
- 应用基础设施与中间件 - 事件驱动型应用
- 平台即服务 (PaaS) - 应用开发平台
适用行业
- 设备与机械
- 金融与保险
适用功能
- 销售与市场营销
用例
- 库存管理
- 租赁金融自动化
关于客户
OTP 银行罗马尼亚是一家综合银行,为个人、中小企业和企业提供完整的金融解决方案。他们是OTP集团的子公司,OTP集团是中东欧最大的金融集团之一。 OTP Bank 已有 70 多年的经营历史,为 11 个国家/地区的超过 1600 万客户提供服务。
挑战
由于手动流程和脱节的技术,OTP Bank 在扩大客户入职规模方面面临限制。他们需要找到创新的方法来管理运营和改善客户服务,以加速市场增长。
解决方案
OTP Bank 选择了 Creatio 的无代码/低代码平台来实现工作流程自动化,以支持其数字化转型战略。他们使用敏捷方法实施了高效的工作流程,并在内部组建了专门的团队来提供专业知识并创建量身定制的解决方案。他们推出了全面的解决方案来管理客户参与、简化交互和自动化贷款工作流程。他们将多个应用程序与 Creatio 集成,以创建银行解决方案和标准化运营的统一生态系统。
运营影响
数量效益
Case Study missing?
Start adding your own!
Register with your work email and create a new case study profile for your business.
相关案例.
Case Study
Smart Water Filtration Systems
Before working with Ayla Networks, Ozner was already using cloud connectivity to identify and solve water-filtration system malfunctions as well as to monitor filter cartridges for replacements.But, in June 2015, Ozner executives talked with Ayla about how the company might further improve its water systems with IoT technology. They liked what they heard from Ayla, but the executives needed to be sure that Ayla’s Agile IoT Platform provided the security and reliability Ozner required.
Case Study
IoT enabled Fleet Management with MindSphere
In view of growing competition, Gämmerler had a strong need to remain competitive via process optimization, reliability and gentle handling of printed products, even at highest press speeds. In addition, a digitalization initiative also included developing a key differentiation via data-driven services offers.
Case Study
Predictive Maintenance for Industrial Chillers
For global leaders in the industrial chiller manufacturing, reliability of the entire production process is of the utmost importance. Chillers are refrigeration systems that produce ice water to provide cooling for a process or industrial application. One of those leaders sought a way to respond to asset performance issues, even before they occur. The intelligence to guarantee maximum reliability of cooling devices is embedded (pre-alarming). A pre-alarming phase means that the cooling device still works, but symptoms may appear, telling manufacturers that a failure is likely to occur in the near future. Chillers who are not internet connected at that moment, provide little insight in this pre-alarming phase.
Case Study
Premium Appliance Producer Innovates with Internet of Everything
Sub-Zero faced the largest product launch in the company’s history:It wanted to launch 60 new products as scheduled while simultaneously opening a new “greenfield” production facility, yet still adhering to stringent quality requirements and manage issues from new supply-chain partners. A the same time, it wanted to increase staff productivity time and collaboration while reducing travel and costs.
Case Study
Integration of PLC with IoT for Bosch Rexroth
The application arises from the need to monitor and anticipate the problems of one or more machines managed by a PLC. These problems, often resulting from the accumulation over time of small discrepancies, require, when they occur, ex post technical operations maintenance.
Case Study
Robot Saves Money and Time for US Custom Molding Company
Injection Technology (Itech) is a custom molder for a variety of clients that require precision plastic parts for such products as electric meter covers, dental appliance cases and spools. With 95 employees operating 23 molding machines in a 30,000 square foot plant, Itech wanted to reduce man hours and increase efficiency.