BlueCat helps W&W Informatik seamlessly transition from previous DDI solution, increasing productivity and eliminating down-time
Customer Company Size
Large Corporate
Region
- Europe
Country
- Germany
Product
- BlueCat IPAM
- BlueCat DNS/DHCP
- BlueCat VCO Plugin
Tech Stack
- DNS
- DHCP
- IPAM
- VMWare automation
- Server automation
Implementation Scale
- Enterprise-wide Deployment
Impact Metrics
- Productivity Improvements
- Cost Savings
- Digital Expertise
Technology Category
- Infrastructure as a Service (IaaS) - Cloud Computing
- Infrastructure as a Service (IaaS) - Cloud Middleware & Microservices
Applicable Functions
- Discrete Manufacturing
- Business Operation
Use Cases
- Factory Operations Visibility & Intelligence
- Cybersecurity
- Predictive Maintenance
Services
- Cloud Planning, Design & Implementation Services
- System Integration
About The Customer
W&W Informatik is a German information technology company based in Ludwigsburg. It was founded in 2002 following the merge of the IT departments of all the Wüstenrot & Württembergische Group companies. W&W Informatik, a subsidiary of W&W AG, is responsible for all networks, decentralized systems, architectures and computer centers within the W&W Group. W&W’s network consists of 50,000 IP addresses (35,000 dynamic client IP addresses and 15,000 static IP addresses) and is continuing to grow, with 20,000 people accessing the network. Users typically connect through a local area network (LAN), but the 15,000 remote workers and 4,500 remote office locations also rely on VPN to connect. The DDI infrastructure is managed by a two-person DDI team based in Ludwigsburg, Germany.
The Challenge
W&W Informatik, a German IT company, was facing challenges with its previous DDI vendor. The outdated version of the solution they were using had limited functionality, poor data consistency, and major issues handling high volumes of DDNS transactions. These limitations reduced the performance, reliability, and availability of the solution, hindering W&W’s productivity. Periodically, all VOIP phones would reboot causing the solution to fail, resulting in outages of the VOIP infrastructure. W&W’s network is heavily distributed across Germany and with the company’s rapid growth, they must deal with the challenge of offices frequently opening and sometimes closing. Each new office requires the setup of a small network. To support this rapid growth, W&W needed to find a DNS, DHCP and IP Address Management (DDI) solution that would grow with its network. Their network needs have evolved since their legacy solution was initially rolled out – the company’s focus has shifted to private cloud implementation, VMWare automation and server automation – and their solution was no longer able to meet their requirements. Additionally, their previous DDI vendor did not offer the ease of upgrade and support that W&W was looking for.
The Solution
W&W Informatik implemented the BlueCat solutions for internal DNS, DHCP and IPAM, as well as the BlueCat VCO Plugin. W&W helped extract the necessary data from the legacy IPAM tool and BlueCat handled the entirety of the migration and a thorough database cleanse, which went very smoothly. BlueCat’s approach to validating, optimizing, testing and importing the data proved very valuable to the customer. This was a major improvement over their legacy solution, where DNS and DHCP were running on separate systems, making the former upgrade processes unnecessarily complex. With BlueCat, as recently experienced, upgrades and patching are made seamless and without downtime. BlueCat provided W&W with a centrally managed, single-vendor solution that scales with their company’s rapid growth. The BlueCat solution was much more intuitive, easy to implement and offered a level of support that W&W had not seen with their legacy solution.
Operational Impact
Quantitative Benefit
Case Study missing?
Start adding your own!
Register with your work email and create a new case study profile for your business.
Related Case Studies.
Case Study
Remote Monitoring & Predictive Maintenance App for a Solar Energy System
The maintenance & tracking of various modules was an overhead for the customer due to the huge labor costs involved. Being an advanced solar solutions provider, they wanted to ensure early detection of issues and provide the best-in-class customer experience. Hence they wanted to automate the whole process.
Case Study
Predictive Maintenance for Industrial Chillers
For global leaders in the industrial chiller manufacturing, reliability of the entire production process is of the utmost importance. Chillers are refrigeration systems that produce ice water to provide cooling for a process or industrial application. One of those leaders sought a way to respond to asset performance issues, even before they occur. The intelligence to guarantee maximum reliability of cooling devices is embedded (pre-alarming). A pre-alarming phase means that the cooling device still works, but symptoms may appear, telling manufacturers that a failure is likely to occur in the near future. Chillers who are not internet connected at that moment, provide little insight in this pre-alarming phase.
Case Study
Aircraft Predictive Maintenance and Workflow Optimization
First, aircraft manufacturer have trouble monitoring the health of aircraft systems with health prognostics and deliver predictive maintenance insights. Second, aircraft manufacturer wants a solution that can provide an in-context advisory and align job assignments to match technician experience and expertise.
Case Study
Integral Plant Maintenance
Mercedes-Benz and his partner GAZ chose Siemens to be its maintenance partner at a new engine plant in Yaroslavl, Russia. The new plant offers a capacity to manufacture diesel engines for the Russian market, for locally produced Sprinter Classic. In addition to engines for the local market, the Yaroslavl plant will also produce spare parts. Mercedes-Benz Russia and his partner needed a service partner in order to ensure the operation of these lines in a maintenance partnership arrangement. The challenges included coordinating the entire maintenance management operation, in particular inspections, corrective and predictive maintenance activities, and the optimizing spare parts management. Siemens developed a customized maintenance solution that includes all electronic and mechanical maintenance activities (Integral Plant Maintenance).
Case Study
Asset Management and Predictive Maintenance
The customer prides itself on excellent engineering and customer centric philosophy, allowing its customer’s minds to be at ease and not worry about machine failure. They can easily deliver the excellent maintenance services to their customers, but there are some processes that can be automated to deliver less downtime for the customer and more efficient maintenance schedules.