Technology Category
- Sensors - Gas Sensors
- Sensors - Utility Meters
Applicable Industries
- Equipment & Machinery
- Oil & Gas
Applicable Functions
- Maintenance
- Product Research & Development
Use Cases
- Time Sensitive Networking
Services
- System Integration
About The Customer
MAN Energy Solutions is a subsidiary of German mechanical engineering company MAN SE. It is a leading supplier of large diesel engines and turbo machines, with a staff of over 15,000 located at more than 100 sites internationally. The company is based in Augsburg, Germany, and comprises four business units: Engines & Marine Systems, Power Plants, Turbo Machinery, and After Sales. Its product line includes two and four-stroke engines, gas and steam turbines, compressors, turbo chargers, controllable pitch propellers, gas engines, and chemical reactors.
The Challenge
MAN Energy Solutions, a leading supplier of large diesel engines and turbo machines, was grappling with a complex, hardware-intensive workflow system that was prone to failure. The system was built with a single point of failure, which meant that when it went down, it caused widespread productivity issues. Repairs and maintenance were not only expensive but also required intervention from a UK-based team, adding to the complexity and inefficiency. The intricate workflow design intimidated many of the company's users, which further impacted company-wide adoption and efficiencies. MAN Energy Solutions needed a less complex workflow solution that would optimize its investment in SharePoint technologies, reduce overhead, improve productivity, and enhance business process automation.
The Solution
In collaboration with its IT partner Innofactor Denmark, MAN Energy Solutions decided to deploy a Nintex Workflow-based solution. Nintex Workflow is a powerful, easy-to-use workflow designer that improves business processes and delivers a rapid return on investment. It integrates seamlessly with other systems, tools, and services in the IT environment, and boosts and extends SharePoint functionality. MAN Energy Solutions uses Nintex Workflow with its Atlas intranet, with two front-end servers that support about 50 workflows of varying size and complexity. The Nintex solution greatly simplified workflow approval processes, reduced licensing costs, and increased system reliability. The Nintex multi-point failover reduced downtime to nearly nothing, and the ease-of-use of the Nintex solution enabled business-side employees to build workflows on their own.
Operational Impact
Quantitative Benefit
Case Study missing?
Start adding your own!
Register with your work email and create a new case study profile for your business.
Related Case Studies.
Case Study
Smart Water Filtration Systems
Before working with Ayla Networks, Ozner was already using cloud connectivity to identify and solve water-filtration system malfunctions as well as to monitor filter cartridges for replacements.But, in June 2015, Ozner executives talked with Ayla about how the company might further improve its water systems with IoT technology. They liked what they heard from Ayla, but the executives needed to be sure that Ayla’s Agile IoT Platform provided the security and reliability Ozner required.
Case Study
IoT enabled Fleet Management with MindSphere
In view of growing competition, Gämmerler had a strong need to remain competitive via process optimization, reliability and gentle handling of printed products, even at highest press speeds. In addition, a digitalization initiative also included developing a key differentiation via data-driven services offers.
Case Study
Taking Oil and Gas Exploration to the Next Level
DownUnder GeoSolutions (DUG) wanted to increase computing performance by 5 to 10 times to improve seismic processing. The solution must build on current architecture software investments without sacrificing existing software and scale computing without scaling IT infrastructure costs.
Case Study
Predictive Maintenance for Industrial Chillers
For global leaders in the industrial chiller manufacturing, reliability of the entire production process is of the utmost importance. Chillers are refrigeration systems that produce ice water to provide cooling for a process or industrial application. One of those leaders sought a way to respond to asset performance issues, even before they occur. The intelligence to guarantee maximum reliability of cooling devices is embedded (pre-alarming). A pre-alarming phase means that the cooling device still works, but symptoms may appear, telling manufacturers that a failure is likely to occur in the near future. Chillers who are not internet connected at that moment, provide little insight in this pre-alarming phase.
Case Study
Premium Appliance Producer Innovates with Internet of Everything
Sub-Zero faced the largest product launch in the company’s history:It wanted to launch 60 new products as scheduled while simultaneously opening a new “greenfield” production facility, yet still adhering to stringent quality requirements and manage issues from new supply-chain partners. A the same time, it wanted to increase staff productivity time and collaboration while reducing travel and costs.