Customer Company Size
Mid-size Company
Region
- Pacific
Country
- Australia
Product
- EcoStruxure IT Expert
- EcoStruxure Asset Advisor
- InRowTM DX cooling units
- EcoAisle containment system
- LV switchboards and breakers
Tech Stack
- IoT
- Data Centres
- Remote Access
- Solar Inverter
- Prefabricated Infrastructure
Implementation Scale
- Enterprise-wide Deployment
Impact Metrics
- Cost Savings
- Customer Satisfaction
- Productivity Improvements
- Environmental Impact Reduction
Technology Category
- Infrastructure as a Service (IaaS) - Cloud Computing
- Infrastructure as a Service (IaaS) - Cloud Storage Services
Applicable Industries
- Telecommunications
- Utilities
Applicable Functions
- Logistics & Transportation
- Maintenance
Use Cases
- Remote Asset Management
- Energy Management System
- Infrastructure Inspection
Services
- Cloud Planning, Design & Implementation Services
- System Integration
- Testing & Certification
About The Customer
Leading Edge Data Centres is an Australian company founded in 2018 with a mission to bridge the digital divide in regional Australia. The company provides businesses and communities with greater access to stable, reliable, and cost-effective connectivity. It aims to do this through a ground-breaking initiative involving a network of lights-out, highly automated data centres. Leading Edge Data Centres’s potential customers have previously suffered through connectivity outages costing them up to $160,000 a year, according to an ITWire report. Leading Edge Data Centres is committed to an uptime promise which can save its customers up to 80% of that cost.
The Challenge
Leading Edge Data Centres wanted to bring stable, reliable, cost-effective connectivity to regional Australia. The company needed a technology partner that could design and build a reliable prefabricated and certified edge data centre, which could be replicated quickly in multiple regional sites around Australia. The team was also looking for a company that could provide a network of engineers to support these sites into the future. A huge challenge for Leading Edge Data Centres is that the distance between its sites makes cost-effective, in-person monitoring almost impossible. Furthermore, most of its sites are greenfield locations, and as a result, power infrastructure is limited. For these reasons, it needed a reliable solution, backup redundancies, and remote access. Leading Edge Data Centres also required an energy monitoring system to accurately track and report in real time the usage of hundreds of customers.
The Solution
To ensure rapid deployment and ultra-reliable operation, Leading Edge Data Centres chooses to utilize Schneider Electric prefabricated data centre infrastructure. The data centres are designed, built, and tested in Australia before they are shipped to site. This removes many of the traditional construction complications and ensures each new Leading Edge Data Centres facility is designed with the same quality, durability, and reliability as the last. As well as reliability, Leading Edge Data Centres required a solution that was efficient and robust. With this in mind, Schneider Electric and Leading Edge Data Centres designed a series of edge data centres, each of a size most effective for the community they service. At the Newcastle Edge Data Centre in New South Wales, the solution includes 20 InRow DX cooling units with EcoAisle containment to keep energy usage to a minimum. The EcoAisle solution utilizes Active Flow Control to maximize the cooling systems’ efficiency by balancing airflow and eliminating pressure differences inside the aisle.
Operational Impact
Quantitative Benefit
Case Study missing?
Start adding your own!
Register with your work email and create a new case study profile for your business.
Related Case Studies.
Case Study
IoT Solutions for Smart City | Internet of Things Case Study
There were several challenges faced: It is challenging to build an appliance that can withstand a wide range of voltage fluctuations from as low at 90v to as high as 320v. Since the device would be installed in remote locations, its resilience was of paramount importance. The device would have to deal with poor network coverage and have the ability to store and re-transmit data if networks were not available, which is often the case in rural India. The device could store up to 30 days of data.
Case Study
Automation of the Oguz-Gabala-Baku water pipeline, Azerbaijan
The Oguz-Gabala-Baku water pipeline project dates back to plans from the 1970’s. Baku’s growth was historically driven by the booming oil industry and required the import of drinking water from outside of the city. Before the construction of the pipeline, some 60 percent of the city’s households received water for only a few hours daily. After completion of the project, 75 percent of the two million Baku residents are now served around the clock with potable water, based on World Health Organization (WHO) standards. The 262-kilometer pipeline requires no pumping station, but uses the altitude differences between the Caucasian mountains and the capital to supply 432,000 m³/d to the Ceyranbatan water reservoir. To the people of Baku, the pipeline is “the most important project not only in 2010, but of the last 20 years.”
Case Study
GPRS Mobile Network for Smart Metering
Around the world, the electricity supply industry is turning to ‘smart’ meters to lower costs, reduce emissions and improve the management of customer supplies. Smart meters collect detailed consumption information and using this feedback consumers can better understand their energy usage which in turn enables them to modify their consumption to save money and help to cut carbon emissions. A smart meter can be defined in many ways, but generally includes an element of two-way communication between the household meter and the utility provider to efficiently collect detailed energy usage data. Some implementations include consumer feedback beyond the energy bill to include online web data, SMS text messages or an information display in consumers’ premises. Providing a cost-effective, reliable communications mechanism is one of the most challenging aspects of a smart meter implementation. In New Zealand, the utilities have embraced smart metering and designed cost effective ways for it to be implemented. The New Zealand government has encouraged such a move to smart metering by ensuring the energy legislation is consistent with the delivery of benefits to the consumer while allowing innovation in this area. On the ground, AMS is a leader in the deployment of smart metering and associated services. Several of New Zealand’s energy retailers were looking for smart metering services for their residential and small business customers which will eventually account for over 500,000 meters when the multi-year national deployment program is concluded. To respond to these requirements, AMS needed to put together a solution that included data communications between each meter and the central data collection point and the solution proposed by Vodafone satisfied that requirement.
Case Study
NB-IoT connected smart meters to improve gas metering in Shenzhen
Shenzhen Gas has a large fleet of existing gas meters, which are installed in a variety of hard to reach locations, such as indoors and underground, meaning that existing communications networks have struggled to maintain connectivity with all meters. The meter success rate is low, data transmissions are so far unstable and power consumption is too high. Against this background, Shenzhen Gas, China Telecom, Huawei, and Goldcard have jointly trialed NB-IoT gas meters to try and solve some of the challenges that the industry faces with today’s smart gas meters.
Case Study
OneWireless Enabled Performance Guarantee Test
Tata Power's power generation equipment OEMs (M/s BHEL) is required to provide all of the instrumentation and measurement devices for conducting performance guarantee and performance evaluation tests. M/s BHEL faced a number of specific challenges in conducting PG tests: employing high-accuracy digital communications for instrumentation, shortening setup and dismantling time, reducing hardware required, making portable instrument setup, avoiding temporary cabling work and the material waste costs
Case Study
British Gas Modernizes its Operations with Innovative Smart Metering Deployment
The UK government has mandated that smart meters are rolled out as standard across Great Britain by end of 2020, and this roll-out is estimated to create £14 billion in net benefits to the UK in consumer energy savings and lower energy generation demand, according to the Oxford Economics report, “The Value of Smart Metering to Great Britain.” While smart-metering systems have been deployed in many countries, the roll-out in Great Britain is unique because it is led by energy retailers, who have responsibility for the Electricity and Gas meters. The decision to have a retailer-led roll out was made by DECC (Department of Energy and Climate Change) to improve customer experience and drive consumer benefits. It has also led to some unique system-level requirements to support the unique local regulatory model.