About The Customer
ABstructures is a company that provides innovative design solutions for lightweight structures, both in advanced composite materials and high-performance metal alloys. With over a decade of experience operating at the highest level in international yacht racing, ABstructures has been involved in prestigious events from America's Cup to 'round-the-world yacht races, such as the Volvo Ocean Race. In addition to the yacht racing industry, ABstructures also provides its services to the aerospace industry and to development teams of racing cars. The company follows an optimized lightweight approach from project brief to concept development and product delivery.
The Challenge
ABstructures, a company specializing in innovative design solutions for lightweight structures, was tasked with the challenge of developing a structurally optimized racing yacht within a preset time frame for the Volvo Ocean Race 2009. The challenge was compounded by the strict boundary conditions of the Volvo Open70 Rule, which defined parameters such as the keel weight to be between 6.0-7.4 tons and the overall weight of the yacht to be close to 14 tons. The company needed to design and optimize the carbon structures of the yacht to achieve fundamental structural improvements compared to the older-generation yachts that competed in the 2004 edition of the Volvo Ocean Race.
The Solution
ABstructures employed the CAE suite HyperWorks to structurally design and optimize the yacht. The solution involved full structural design and structural multilayer optimization for maximizing performances like strength, stiffness, and minimum weight by using cutting-edge CAE technology. This included the optimization of all structurally relevant parts of the yacht such as the keel fin sections, the cant mechanism, and the associated structure. Advanced optimization concepts were applied to streamline the process for designing composite laminates. The solution also involved identifying the three key phases involved in the design process and coupling them with various optimization techniques. The application of free size optimization allowed the synthesis of concepts that utilize all the potential of a composite structure. The ply sizes generated at the concept stage were fine-tuned by applying a detailed ply sizing optimization for design performance and manufacturing requirements.
Operational Impact
Quantitative Benefit
Case Study missing?
Start adding your own!
Register with your work email and create a new case study profile for your business.
Related Case Studies.
Case Study
Airbus Soars with Wearable Technology
Building an Airbus aircraft involves complex manufacturing processes consisting of thousands of moving parts. Speed and accuracy are critical to business and competitive advantage. Improvements in both would have high impact on Airbus’ bottom line. Airbus wanted to help operators reduce the complexity of assembling cabin seats and decrease the time required to complete this task.
Case Study
Aircraft Predictive Maintenance and Workflow Optimization
First, aircraft manufacturer have trouble monitoring the health of aircraft systems with health prognostics and deliver predictive maintenance insights. Second, aircraft manufacturer wants a solution that can provide an in-context advisory and align job assignments to match technician experience and expertise.
Case Study
Aerospace & Defense Case Study Airbus
For the development of its new wide-body aircraft, Airbus needed to ensure quality and consistency across all internal and external stakeholders. Airbus had many challenges including a very aggressive development schedule and the need to ramp up production quickly to satisfy their delivery commitments. The lack of communication extended design time and introduced errors that drove up costs.
Case Study
Developing Smart Tools for the Airbus Factory
Manufacturing and assembly of aircraft, which involves tens of thousands of steps that must be followed by the operators, and a single mistake in the process could cost hundreds of thousands of dollars to fix, makes the room for error very small.
Case Study
Accelerate Production for Spirit AeroSystems
The manufacture and assembly of massive fuselage assemblies and other large structures generates a river of data. In fact, the bill of materials for a single fuselage alone can be millions of rows of data. In-house production processes and testing, as well as other manufacturers and customers created data flows that overwhelmed previous processes and information systems. Spirit’s customer base had grown substantially since their 2005 divestiture from Boeing, resulting in a $41 billion backlog of orders to fill. To address this backlog, meet increased customer demands and minimize additional capital investment, the company needed a way to improve throughput in the existing operational footprint. Spirit had a requirement from customers to increase fuselage production by 30%. To accomplish this goal, Spirit needed real-time information on its value chain and workflow. However, the two terabytes of data being pulled from their SAP ECC was unmanageable and overloaded their business warehouse. It had become time-consuming and difficult to pull aggregate data, disaggregate it for the needed information and then reassemble to create a report. During the 6-8 hours it took to build a report, another work shift (they run three per day) would have already taken place, thus the report content was out-of-date before it was ever delivered. As a result, supervisors often had to rely on manual efforts to provide charts, reports and analysis.