China-based Beijing Urban Construction Group (BUCG)
About The Customer
Beijing Urban Construction Group (BUCG) is a large international construction group based in China. The company primarily focuses on general contracting, real estate development, and design and consultancy. BUCG manages 120 subsidiary companies and 42 branch offices, including one publicly listed company, 27 exclusively-invested companies, and holding companies. BUCG has constructed many of China’s namesake land development projects, including the National Stadium, the National Theater for the Performing Arts, the National Museum, the National Indoor Stadium, the Olympic Basketball Stadium, the Olympic Village, and Terminal 3 of Beijing Capital International Airport. In 2016, BUCG was awarded the contract for the expansion of the Ibrahim Nasir International Airport on Hulhule island in the Maldives.
The Challenge
Beijing Urban Construction Group (BUCG), a China-based international construction group, was contracted for a $440 million expansion and land reclamation project for the Maldives Airport. The project involved extensive land reclamation work, mass excavation, fine grading, and precise runway paving and compaction. The expansion required the removal of four million cubic meters of sand from the inner lagoon adjacent to the airport. The project also involved the construction of a new 3800 meter-long and 65-meter-wide runway, a fuel farm, a cargo complex, and a new terminal. The project faced tight parameters and required streamlined data flow and communication across the build. BUCG sought to improve safety and productivity, optimize operations, and complete the project on time and within budget.
The Solution
BUCG turned to Trimble and MAG Science & Technology Co, Ltd for help. Several Trimble office software solutions were installed, including Trimble Business Center, Trimble Connect, VisionLink, SketchUp Pro, Vico Office. Field solutions included Trimble SPS985, Trimble GCS900, Trimble CCS900, and Trimble PCS900, Trimble NetRS GPS base station receivers, Trimble 4D control monitoring software, and the TX8 for 3D scanning. Trimble Connect, a cloud-based platform, was implemented to power information and data exchange between owners, architects, subcontractors, engineers, and trades. Vico Office was used to generate 4D schedules and estimates directly from 3D models. The Trimble PCS900 Paving Control System was used for asphalt paving, and the Trimble CCS900 Compaction Control System was used for compaction. The Trimble GCS900 Grade Control System was used for bulk earthworks and fine grading work.
Operational Impact
Quantitative Benefit
Case Study missing?
Start adding your own!
Register with your work email and create a new case study profile for your business.
Related Case Studies.
Case Study
IoT Solutions for Smart City | Internet of Things Case Study
There were several challenges faced: It is challenging to build an appliance that can withstand a wide range of voltage fluctuations from as low at 90v to as high as 320v. Since the device would be installed in remote locations, its resilience was of paramount importance. The device would have to deal with poor network coverage and have the ability to store and re-transmit data if networks were not available, which is often the case in rural India. The device could store up to 30 days of data.
Case Study
Automation of the Oguz-Gabala-Baku water pipeline, Azerbaijan
The Oguz-Gabala-Baku water pipeline project dates back to plans from the 1970’s. Baku’s growth was historically driven by the booming oil industry and required the import of drinking water from outside of the city. Before the construction of the pipeline, some 60 percent of the city’s households received water for only a few hours daily. After completion of the project, 75 percent of the two million Baku residents are now served around the clock with potable water, based on World Health Organization (WHO) standards. The 262-kilometer pipeline requires no pumping station, but uses the altitude differences between the Caucasian mountains and the capital to supply 432,000 m³/d to the Ceyranbatan water reservoir. To the people of Baku, the pipeline is “the most important project not only in 2010, but of the last 20 years.”
Case Study
GPRS Mobile Network for Smart Metering
Around the world, the electricity supply industry is turning to ‘smart’ meters to lower costs, reduce emissions and improve the management of customer supplies. Smart meters collect detailed consumption information and using this feedback consumers can better understand their energy usage which in turn enables them to modify their consumption to save money and help to cut carbon emissions. A smart meter can be defined in many ways, but generally includes an element of two-way communication between the household meter and the utility provider to efficiently collect detailed energy usage data. Some implementations include consumer feedback beyond the energy bill to include online web data, SMS text messages or an information display in consumers’ premises. Providing a cost-effective, reliable communications mechanism is one of the most challenging aspects of a smart meter implementation. In New Zealand, the utilities have embraced smart metering and designed cost effective ways for it to be implemented. The New Zealand government has encouraged such a move to smart metering by ensuring the energy legislation is consistent with the delivery of benefits to the consumer while allowing innovation in this area. On the ground, AMS is a leader in the deployment of smart metering and associated services. Several of New Zealand’s energy retailers were looking for smart metering services for their residential and small business customers which will eventually account for over 500,000 meters when the multi-year national deployment program is concluded. To respond to these requirements, AMS needed to put together a solution that included data communications between each meter and the central data collection point and the solution proposed by Vodafone satisfied that requirement.
Case Study
Energy Saving & Power Monitoring System
Recently a university in Taiwan was experiencing dramatic power usage increases due to its growing number of campus buildings and students. Aiming to analyze their power consumption and increase their power efficiency across 52 buildings, the university wanted to build a power management system utilizing web-based hardware and software. With these goals in mind, they contacted Advantech to help them develop their system and provide them with the means to save energy in the years to come.
Case Study
NB-IoT connected smart meters to improve gas metering in Shenzhen
Shenzhen Gas has a large fleet of existing gas meters, which are installed in a variety of hard to reach locations, such as indoors and underground, meaning that existing communications networks have struggled to maintain connectivity with all meters. The meter success rate is low, data transmissions are so far unstable and power consumption is too high. Against this background, Shenzhen Gas, China Telecom, Huawei, and Goldcard have jointly trialed NB-IoT gas meters to try and solve some of the challenges that the industry faces with today’s smart gas meters.
Case Study
OneWireless Enabled Performance Guarantee Test
Tata Power's power generation equipment OEMs (M/s BHEL) is required to provide all of the instrumentation and measurement devices for conducting performance guarantee and performance evaluation tests. M/s BHEL faced a number of specific challenges in conducting PG tests: employing high-accuracy digital communications for instrumentation, shortening setup and dismantling time, reducing hardware required, making portable instrument setup, avoiding temporary cabling work and the material waste costs