Technology Category
- Infrastructure as a Service (IaaS) - Cloud Computing
- Sensors - Temperature Sensors
Applicable Industries
- Automotive
- Electrical Grids
Applicable Functions
- Product Research & Development
Use Cases
- Construction Management
- Vehicle-to-Infrastructure
Services
- Hardware Design & Engineering Services
- System Integration
About The Customer
TRW Automotive is a global technology company that specializes in automotive safety systems. The company's products, which include brakes, airbags, seat belts, and steering systems, are used by almost every car and truck maker worldwide. In Europe, TRW Automotive's safety systems are designed at several engineering centers. The company's Chassis group, which was the focus of this case study, is one of these engineering centers. The group was looking to increase compute power and improve workflow, and turned to GNS Systems for a solution.
The Challenge
TRW Automotive, a global technology company and a Tier One automotive industry supplier, was facing a challenge in its European engineering centers. The company's Chassis group, responsible for designing safety systems, was operating exclusively on desktop workstations and was seeking to increase compute power and streamline workflow. The group was also keen on not committing its limited internal IT resources to the development of a new CAE computing infrastructure. The challenge was to find a solution that could provide more compute power, improve workflow, and be implemented without straining the company's IT resources.
The Solution
The Chassis group turned to GNS Systems, a systems integrator recommended by Altair Engineering, to develop a standard CAE solution for the four engineering sites. GNS Systems was tasked with providing the complete solution, including design, purchasing, installation, implementation, and ongoing post-installation support. The group considered three workload management systems for potential use on its new HPC clusters: LSF, Sun GridEngine, and PBS Professional. By the end of 2005, GNS Systems had installed Linux-based, Intel-driven PC clusters within several engineering sites and configured PBS Professional on all systems. The same technology is set to be installed in one Eastern European Site. This standardization is expected to save TRW administration costs and simplify purchases, changes, upgrades, and collaboration between engineering sites.
Operational Impact
Quantitative Benefit
Case Study missing?
Start adding your own!
Register with your work email and create a new case study profile for your business.
Related Case Studies.
Case Study
Integral Plant Maintenance
Mercedes-Benz and his partner GAZ chose Siemens to be its maintenance partner at a new engine plant in Yaroslavl, Russia. The new plant offers a capacity to manufacture diesel engines for the Russian market, for locally produced Sprinter Classic. In addition to engines for the local market, the Yaroslavl plant will also produce spare parts. Mercedes-Benz Russia and his partner needed a service partner in order to ensure the operation of these lines in a maintenance partnership arrangement. The challenges included coordinating the entire maintenance management operation, in particular inspections, corrective and predictive maintenance activities, and the optimizing spare parts management. Siemens developed a customized maintenance solution that includes all electronic and mechanical maintenance activities (Integral Plant Maintenance).
Case Study
Hydro One Leads the Way In Smart Meter Development
In 2010, Ontario’s energy board mandated that time-of-use (TOU) pricing for consumers be available for all consumers on a regulated price plan. To meet this requirement, Hydro One needed to quickly deploy a smart meter and intelligent communications network solution to meet the provincial government’s requirement at a low cost. The network needed to cover Hydro One’s expansive service territory, which has a land mass twice the size of Texas, and its customers live in a mix of urban, rural, and remote areas, some places only accessible by air, rail, boat or snowmobile. Most importantly, the network needed to enable future enterprise-wide business efficiencies, modernization of distribution infrastructure and enhanced customer service. To meet these needs, Hydro One conceptualized an end-to-end solution leveraging open standards and Internet Protocols (IP) at all communication levels. The utility drew upon industry leaders like Trilliant to realize this vision.
Case Study
Monitoring of Pressure Pumps in Automotive Industry
A large German/American producer of auto parts uses high-pressure pumps to deburr machined parts as a part of its production and quality check process. They decided to monitor these pumps to make sure they work properly and that they can see any indications leading to a potential failure before it affects their process.