About The Customer
Amazone is a company that develops and produces innovative agricultural technology with a high standard of quality, enabling and supporting modern and economical arable farming methods. They are committed to contributing to their customers’ success by leveraging advanced development tools, processes, and manufacturing methods. Their products are used under very harsh and extremely varying conditions, and they understand that in addition to service quality and the availability of spare parts, product longevity is a key purchase criterion for farmers. Therefore, when developing a new product, they not only have to be competitive regarding price, but they also have to consider the durability of the product, as this aspect impacts the manufacturer’s reputation in the marketplace.
The Challenge
Amazone, a producer of innovative agricultural technology, was faced with the challenge of redesigning a welded suspension component as a casting part, while improving its weight and durability properties. The component in question was a part of the trailed compact disc harrow, Catros-2TS, used for soil tillage. The original component was a complex welded part weighing 245 kg, with 16.5 m of weld seams needed to join the single parts. This made the production process time-consuming and costly. The challenge was not only to optimize the manufacturing process but also to increase the longevity of the component, as product longevity is a key purchase criterion for farmers. The equipment must be robust enough for harsh operating conditions, and design improvements must not lead to higher prices for the final product.
The Solution
Amazone employed a simulation-driven design process to eliminate unnecessary design iterations and reach a final design faster. They used Altair Engineering’s structural solver and optimization tool OptiStruct and solidThinking Inspire. The engineers first evaluated the weight savings and performance increase of the component if produced using a casting process. They conducted an upfront topology optimization and defined the possible design space and the boundary conditions, such as loads, required stiffness, and manufacturing restrictions. The software calculated how much material was needed and at which position it had to be placed in order to meet requirements such as structural strength. From the optimization result, the engineers created a detailed design which was then evaluated in a FE analysis with OptiStruct. The casted version realized a lower weight and smoother transitions of the structure, resulting in fewer stiffness variations. The overall loading in the casted material of the new design was significantly lower compared to the loadings in the weld seams of the original assembly.
Operational Impact
Quantitative Benefit
Case Study missing?
Start adding your own!
Register with your work email and create a new case study profile for your business.
Related Case Studies.
Case Study
Smart Water Filtration Systems
Before working with Ayla Networks, Ozner was already using cloud connectivity to identify and solve water-filtration system malfunctions as well as to monitor filter cartridges for replacements.But, in June 2015, Ozner executives talked with Ayla about how the company might further improve its water systems with IoT technology. They liked what they heard from Ayla, but the executives needed to be sure that Ayla’s Agile IoT Platform provided the security and reliability Ozner required.
Case Study
IoT enabled Fleet Management with MindSphere
In view of growing competition, Gämmerler had a strong need to remain competitive via process optimization, reliability and gentle handling of printed products, even at highest press speeds. In addition, a digitalization initiative also included developing a key differentiation via data-driven services offers.
Case Study
Predictive Maintenance for Industrial Chillers
For global leaders in the industrial chiller manufacturing, reliability of the entire production process is of the utmost importance. Chillers are refrigeration systems that produce ice water to provide cooling for a process or industrial application. One of those leaders sought a way to respond to asset performance issues, even before they occur. The intelligence to guarantee maximum reliability of cooling devices is embedded (pre-alarming). A pre-alarming phase means that the cooling device still works, but symptoms may appear, telling manufacturers that a failure is likely to occur in the near future. Chillers who are not internet connected at that moment, provide little insight in this pre-alarming phase.
Case Study
Premium Appliance Producer Innovates with Internet of Everything
Sub-Zero faced the largest product launch in the company’s history:It wanted to launch 60 new products as scheduled while simultaneously opening a new “greenfield” production facility, yet still adhering to stringent quality requirements and manage issues from new supply-chain partners. A the same time, it wanted to increase staff productivity time and collaboration while reducing travel and costs.
Case Study
Integration of PLC with IoT for Bosch Rexroth
The application arises from the need to monitor and anticipate the problems of one or more machines managed by a PLC. These problems, often resulting from the accumulation over time of small discrepancies, require, when they occur, ex post technical operations maintenance.
Case Study
Robot Saves Money and Time for US Custom Molding Company
Injection Technology (Itech) is a custom molder for a variety of clients that require precision plastic parts for such products as electric meter covers, dental appliance cases and spools. With 95 employees operating 23 molding machines in a 30,000 square foot plant, Itech wanted to reduce man hours and increase efficiency.