Case Studies.
Add Case Study
Our Case Study database tracks 18,926 case studies in the global enterprise technology ecosystem.
Filters allow you to explore case studies quickly and efficiently.
Download Excel
Filters
-
(4)
- (3)
- (2)
-
(1)
- (1)
-
(1)
- (1)
-
(1)
- (1)
-
(1)
- (1)
- View all 5 Technologies
- (3)
- (1)
- (2)
- (2)
- (3)
- (1)
- (4)
Selected Filters
|
Shuyang ITAD Household Waste Treatment Center Integrated Automated System
Shuyang ITAD household waste treatment center is a large environment facility with intensive and high integrated techniques. To meet the requirement to urban household waste modern integrated treatment and the treatment center scientific management, in the processing design, philosophy and technology about multi-points processing control and automated production line system control have been widely used.
|
|
|
The audible alarm system of the first period of Hongyanhe, Ningde Nuclear power plant Project introduction
Hongyanhe Nuclear power plant is the first nuclear power plant in Northeast of ChinaNingde Nuclear power plant is the first island nuclear power plant in China and the first nuclear power plant on the west coast of the StraitScale: both plants use 4x1000MWe pwr nuclear power unit
|
|
|
Guangzhou Metro Line 3 CMCS Network System Packaged Manufacturing
Construction summaryLine 3 is built with total length of 35.86km, 18 stations, 1 depot, 2 parking lots, 2 master substations and 1 control center. Line 3 is designed to be south-north like a “Y”. The main branch starts from Guangzhou East Railway Station at north, extends to the south by Zhujiang along Tiyu West Road and ends at Fanyu Square along planning Fanyu Road. The sub-branch starts from Tianhe bus station at north and combines with the main branch at Tiyu West Road to the southeast along Wushan.
|
|
|
Guangzhou Metro Line 2 Project
Guangzhou Metro Line 2 operates mileage of 23.265 kilometers, with 20 stations and 1 depot. Metro Line 2 was built and opened from Xiaogang to San Yuanli section, and then opened from Pazhou to San Yuanli the whole line. Guangzhou Metro Line 2 is a milestone in the history of traffic construction in China, whose localization rate is over 70%. When Line 2 has opened for 1 year, it was awarded in the top ten construction science and technology achievement award hold by China Ministry of Construction, together with the Shenzhou V project.
|
|