技术
- 分析与建模 - 实时分析
- 功能应用 - 制造执行系统 (MES)
适用行业
- 汽车
- 设备与机械
适用功能
- 维护
用例
- 添加剂制造
- 根因分析与诊断
服务
- 测试与认证
客户
PathWave 制造分析
关于客户
PathWave 制造分析是一个工业 4.0 就绪的电子制造数据分析平台,它使用从大数据中提取的信息执行实时高级分析,例如制造过程、测试和设备数据。
挑战
<90% FPY 的生产良率立即引起了他们的注意,即生产线某处存在设备问题。他们忙于汇总来自每个功能测试系统的所有数据集,以试图找出导致低产量的原因。他们总共花了大约 6 个月的时间试图找出问题的根源,结果证明这是功能测试系统使用的产品的固定装置之一
.经过大量工作、监控和看似合理的纠正措施后,他们决定每月对 Functional Tester 生产线上的所有装置进行维护,以纠正 FPY 损失。
解决方案
在 PMA 平台完成对历史数据的自动分析后,是德科技现场工程师花了大约 5 分钟的时间找到了有问题的夹具及其问题背后的原因。这个过程证明,PMA 能够通过将调查从 6 个月缩短到 5 分钟来节省时间。
PMA 有一个可定制的报告生成工具,允许用户根据自己的喜好生成报告。然后可以以 PDF 格式下载生成的有趣时间范围的静态报告,以便于共享和跟踪。用户可以分享生产线遇到的任何问题或仅用于跟踪特定项目的相关图表。
运营影响
数量效益
Case Study missing?
Start adding your own!
Register with your work email and create a new case study profile for your business.
相关案例.
Case Study
Smart Water Filtration Systems
Before working with Ayla Networks, Ozner was already using cloud connectivity to identify and solve water-filtration system malfunctions as well as to monitor filter cartridges for replacements.But, in June 2015, Ozner executives talked with Ayla about how the company might further improve its water systems with IoT technology. They liked what they heard from Ayla, but the executives needed to be sure that Ayla’s Agile IoT Platform provided the security and reliability Ozner required.
Case Study
IoT enabled Fleet Management with MindSphere
In view of growing competition, Gämmerler had a strong need to remain competitive via process optimization, reliability and gentle handling of printed products, even at highest press speeds. In addition, a digitalization initiative also included developing a key differentiation via data-driven services offers.
Case Study
Predictive Maintenance for Industrial Chillers
For global leaders in the industrial chiller manufacturing, reliability of the entire production process is of the utmost importance. Chillers are refrigeration systems that produce ice water to provide cooling for a process or industrial application. One of those leaders sought a way to respond to asset performance issues, even before they occur. The intelligence to guarantee maximum reliability of cooling devices is embedded (pre-alarming). A pre-alarming phase means that the cooling device still works, but symptoms may appear, telling manufacturers that a failure is likely to occur in the near future. Chillers who are not internet connected at that moment, provide little insight in this pre-alarming phase.
Case Study
Premium Appliance Producer Innovates with Internet of Everything
Sub-Zero faced the largest product launch in the company’s history:It wanted to launch 60 new products as scheduled while simultaneously opening a new “greenfield” production facility, yet still adhering to stringent quality requirements and manage issues from new supply-chain partners. A the same time, it wanted to increase staff productivity time and collaboration while reducing travel and costs.
Case Study
Integration of PLC with IoT for Bosch Rexroth
The application arises from the need to monitor and anticipate the problems of one or more machines managed by a PLC. These problems, often resulting from the accumulation over time of small discrepancies, require, when they occur, ex post technical operations maintenance.
Case Study
Robot Saves Money and Time for US Custom Molding Company
Injection Technology (Itech) is a custom molder for a variety of clients that require precision plastic parts for such products as electric meter covers, dental appliance cases and spools. With 95 employees operating 23 molding machines in a 30,000 square foot plant, Itech wanted to reduce man hours and increase efficiency.