技术
- 分析与建模 - 过程分析
适用行业
- 设备与机械
- 金融与保险
用例
- 租赁金融自动化
- 过程控制与优化
关于客户
澳大利亚银行是一家总部位于澳大利亚班达伯格的金融机构。该银行为昆士兰地区超过 85,000 名客户提供服务,并致力于为他们提供最佳的银行体验。该银行拥有 250 名员工,管理着超过 30 亿美元的资产。澳大利亚银行对其客户的承诺体现在其“正确之路”计划中,该计划旨在确保银行第一次、每次都为客户做正确的事情。为了支持这一举措,该银行实施了流程管理和自动化工具来改进其流程并增强客户体验。
挑战
Auswide Bank 总部位于澳大利亚昆士兰州,致力于为其超过 85,000 名客户提供最佳的银行体验。这一承诺导致了“正确之路”项目的启动,该项目旨在确保银行第一次、每次都为客户做正确的事情。该计划的一个关键部分是充分了解银行的流程并确定需要改进的领域。然而,该银行在规划流程和优化面向客户的流程(包括贷款发放和个人银行流程)方面面临挑战。该银行需要一个易于使用的流程管理工具和一个无代码工具来通过自动化和数字表单改进业务流程。
解决方案
为了应对这些挑战,Auswide Bank 实施了 Nintex PromappR,一个流程管理和自动化平台。该平台使银行能够全面规划其流程并确定需要改进的领域。该银行已使用 Nintex PromappR 映射了 900 多个流程。此外,该银行还利用 Nintex Forms 和 Nintex Workflow 来支持和优化许多面向客户的流程。这些工具为银行提供了无代码解决方案,通过自动化和数字表单改进业务流程。 Nintex 平台的实施使 Auswide Bank 能够提高流程效率,改善客户体验。
运营影响
数量效益
Case Study missing?
Start adding your own!
Register with your work email and create a new case study profile for your business.
相关案例.
Case Study
Smart Water Filtration Systems
Before working with Ayla Networks, Ozner was already using cloud connectivity to identify and solve water-filtration system malfunctions as well as to monitor filter cartridges for replacements.But, in June 2015, Ozner executives talked with Ayla about how the company might further improve its water systems with IoT technology. They liked what they heard from Ayla, but the executives needed to be sure that Ayla’s Agile IoT Platform provided the security and reliability Ozner required.
Case Study
IoT enabled Fleet Management with MindSphere
In view of growing competition, Gämmerler had a strong need to remain competitive via process optimization, reliability and gentle handling of printed products, even at highest press speeds. In addition, a digitalization initiative also included developing a key differentiation via data-driven services offers.
Case Study
Predictive Maintenance for Industrial Chillers
For global leaders in the industrial chiller manufacturing, reliability of the entire production process is of the utmost importance. Chillers are refrigeration systems that produce ice water to provide cooling for a process or industrial application. One of those leaders sought a way to respond to asset performance issues, even before they occur. The intelligence to guarantee maximum reliability of cooling devices is embedded (pre-alarming). A pre-alarming phase means that the cooling device still works, but symptoms may appear, telling manufacturers that a failure is likely to occur in the near future. Chillers who are not internet connected at that moment, provide little insight in this pre-alarming phase.
Case Study
Premium Appliance Producer Innovates with Internet of Everything
Sub-Zero faced the largest product launch in the company’s history:It wanted to launch 60 new products as scheduled while simultaneously opening a new “greenfield” production facility, yet still adhering to stringent quality requirements and manage issues from new supply-chain partners. A the same time, it wanted to increase staff productivity time and collaboration while reducing travel and costs.
Case Study
Integration of PLC with IoT for Bosch Rexroth
The application arises from the need to monitor and anticipate the problems of one or more machines managed by a PLC. These problems, often resulting from the accumulation over time of small discrepancies, require, when they occur, ex post technical operations maintenance.
Case Study
Robot Saves Money and Time for US Custom Molding Company
Injection Technology (Itech) is a custom molder for a variety of clients that require precision plastic parts for such products as electric meter covers, dental appliance cases and spools. With 95 employees operating 23 molding machines in a 30,000 square foot plant, Itech wanted to reduce man hours and increase efficiency.