AVEVA (Schneider Electric) > 实例探究 > AVEVA software helps a Canadian engineering firm complete projects at 16% under budget with new, faster technology.

AVEVA software helps a Canadian engineering firm complete projects at 16% under budget with new, faster technology.

AVEVA (Schneider Electric) Logo
公司规模
Mid-size Company
地区
  • America
国家
  • Canada
产品
  • AVEVA Integrated Engineering and Design
  • AVEVA NET
技术栈
  • Digital Engineering Environment
  • Data Validation and Comparison
实施规模
  • Enterprise-wide Deployment
影响指标
  • Cost Savings
  • Productivity Improvements
技术
  • 平台即服务 (PaaS) - 应用开发平台
适用行业
  • 石油和天然气
适用功能
  • 离散制造
  • 产品研发
用例
  • 预测性维护
  • 过程控制与优化
服务
  • 软件设计与工程服务
  • 系统集成
关于客户
Vista Projects is a Canada-based engineering firm that specializes in in situ heavy oil, enhanced oil recovery (EOR), and conventional oil & gas projects. The company has engineered over 400,000 barrels per day of in situ oil production. Vista Projects has long been an enthusiastic believer in the value of integrated engineering in a digital environment. However, they were facing challenges with their traditional approach to engineering, which included manual working practices and an over-reliance on Excel spreadsheets. They also believed that each department stands alone in the development of a project.
挑战
Vista Projects, a Canada-based engineering firm, was facing challenges with their traditional approach to engineering. Their old conventional spreadsheet approach was unreliable and prone to errors. The company was also dealing with silos of activity and functions, which made it difficult to expedite projects. They were commissioned by a major Canadian oil & gas producer to deliver the FEED for a large-scale, greenfield, steam-assisted gravity drainage (SAGD) facility. The client wanted close collaboration with Vista to ensure that a compressed engineering schedule could be met and that data accuracy, transparency and security would be best in class.
解决方案
Vista Projects turned to AVEVA Integrated Engineering & Design for a solution. The project was the oil sands industry’s largest and most comprehensive implementation of a digital engineering environment. The AVEVA platform enabled Vista to consolidate project data from multiple sources and make it available in a common location. The team was also able to validate and compare data and check business logic. The data available in AVEVA IE&D is near-live. The platform cross-references and links all related data items the moment data is uploaded, based on the project configuration. AVEVA maintains system, subsystem, and tag relationships in line with system boundary drawings.
运营影响
  • The compressed engineering schedule saves hundreds of man-hours per project, and reduces handover costs.
  • Collaboration between internal teams, clients, and third parties has been enhanced.
  • Data accuracy, transparency, accessibility, and security have been improved.
数量效益
  • There has been a 10-15% reduction in engineering man-hours during the FEED stage.
  • Projects have been completed at 16% under budget.

Case Study missing?

Start adding your own!

Register with your work email and create a new case study profile for your business.

Add New Record

相关案例.

联系我们

欢迎与我们交流!
* Required
* Required
* Required
* Invalid email address
提交此表单,即表示您同意 IoT ONE 可以与您联系并分享洞察和营销信息。
不,谢谢,我不想收到来自 IoT ONE 的任何营销电子邮件。
提交

感谢您的信息!
我们会很快与你取得联系。