技术
- 应用基础设施与中间件 - 区块链
- 平台即服务 (PaaS) - 应用开发平台
适用行业
- 水泥
- 设备与机械
适用功能
- 采购
用例
- 临床图像分析
- 资产跟踪
客户
瓦西里·卡尔皮茨基和阿列克谢·杜卢布
关于客户
Vasiliy Karpitski 和 Alexei Dulub是企业家和区块链爱好者,在技术和软件开发方面拥有 30 多年的共同经验。在分析了与 NFT 投资相关的市场潜力和挑战后,技术布道者决定携手开发智能解决方案,帮助 NFT 投资者做出明智的决策。
挑战
NFT 的指数级增长吸引了众多愿意投资 NFT 市场的创作者、企业和 NFT 爱好者。 2021 年,NFT 的销售额达到 176 亿美元,其中大部分发生在二级市场上。
NFT 收藏品已成为最赚钱的资本投资之一。与此同时,NFT 领域的巨大增长最终导致了越来越多的诈骗和欺诈行为,如黑名单、洗盘、复制等。因此,NFT 购买者、创造者和企业现在都在努力做出高质量的投资决策并规避风险。
解决方案
为了帮助 NFT 爱好者和投资者避免欺诈、评估风险、做出更好的决策并获得收益,这家初创公司决定建立 CheckNFT.iO——一个收集和分析来自区块链网络和 ML 模型的大量数据的平台。
该平台将允许任何对 NFT 行业感兴趣的人轻松验证 NFT 收藏品、寻找宝石和应对诈骗,同时通过让企业客户和分析公司轻松访问最新的 NFT 数据,为他们带来切实的利益。
PixelPlex 团队被指派构建 CheckNFT.iO 解决方案。
运营影响
数量效益
Case Study missing?
Start adding your own!
Register with your work email and create a new case study profile for your business.
相关案例.
Case Study
Smart Water Filtration Systems
Before working with Ayla Networks, Ozner was already using cloud connectivity to identify and solve water-filtration system malfunctions as well as to monitor filter cartridges for replacements.But, in June 2015, Ozner executives talked with Ayla about how the company might further improve its water systems with IoT technology. They liked what they heard from Ayla, but the executives needed to be sure that Ayla’s Agile IoT Platform provided the security and reliability Ozner required.
Case Study
IoT enabled Fleet Management with MindSphere
In view of growing competition, Gämmerler had a strong need to remain competitive via process optimization, reliability and gentle handling of printed products, even at highest press speeds. In addition, a digitalization initiative also included developing a key differentiation via data-driven services offers.
Case Study
Predictive Maintenance for Industrial Chillers
For global leaders in the industrial chiller manufacturing, reliability of the entire production process is of the utmost importance. Chillers are refrigeration systems that produce ice water to provide cooling for a process or industrial application. One of those leaders sought a way to respond to asset performance issues, even before they occur. The intelligence to guarantee maximum reliability of cooling devices is embedded (pre-alarming). A pre-alarming phase means that the cooling device still works, but symptoms may appear, telling manufacturers that a failure is likely to occur in the near future. Chillers who are not internet connected at that moment, provide little insight in this pre-alarming phase.
Case Study
Premium Appliance Producer Innovates with Internet of Everything
Sub-Zero faced the largest product launch in the company’s history:It wanted to launch 60 new products as scheduled while simultaneously opening a new “greenfield” production facility, yet still adhering to stringent quality requirements and manage issues from new supply-chain partners. A the same time, it wanted to increase staff productivity time and collaboration while reducing travel and costs.
Case Study
System 800xA at Indian Cement Plants
Chettinad Cement recognized that further efficiencies could be achieved in its cement manufacturing process. It looked to investing in comprehensive operational and control technologies to manage and derive productivity and energy efficiency gains from the assets on Line 2, their second plant in India.
Case Study
Integration of PLC with IoT for Bosch Rexroth
The application arises from the need to monitor and anticipate the problems of one or more machines managed by a PLC. These problems, often resulting from the accumulation over time of small discrepancies, require, when they occur, ex post technical operations maintenance.