技术
- 功能应用 - 仓库管理系统 (WMS)
- 基础设施即服务 (IaaS) - 云计算
适用行业
- 水泥
- 设备与机械
适用功能
- 质量保证
- 仓库和库存管理
用例
- 施工管理
- 拣选/分拣/定位
服务
- 云规划/设计/实施服务
- 测试与认证
关于客户
我们的客户是一家全球托管云服务提供商,在全球办事处拥有近 10,000 名员工。他们提供个性化的白手套云托管解决方案,帮助客户简化基础设施管理并减轻 IT 资源的压力。他们在全球拥有 40 多个数据中心,管理着数十万个客户的虚拟机。
挑战
我们的客户需要使为其客户生成每月服务报告的过程更具成本效益。该过程需要大量的手动工作并使用付费的第三方工具。这是由于缺乏集中和统一的方法来处理客户从其设备收到的大量数据造成的。
解决方案
N-iX 通过将 MS SQL Server 基础架构迁移到 GCP 并自动生成服务报告的过程,帮助客户显着降低了开支。他们在GCP中构建了统一的数据仓库,标准化和统一了所有数据,并使用Google Cloud Dataflow将数据从Kafka传输到BigQuery。他们还将原始数据自动处理到 MSR 中。
运营影响
数量效益
Case Study missing?
Start adding your own!
Register with your work email and create a new case study profile for your business.
相关案例.
Case Study
Smart Water Filtration Systems
Before working with Ayla Networks, Ozner was already using cloud connectivity to identify and solve water-filtration system malfunctions as well as to monitor filter cartridges for replacements.But, in June 2015, Ozner executives talked with Ayla about how the company might further improve its water systems with IoT technology. They liked what they heard from Ayla, but the executives needed to be sure that Ayla’s Agile IoT Platform provided the security and reliability Ozner required.
Case Study
IoT enabled Fleet Management with MindSphere
In view of growing competition, Gämmerler had a strong need to remain competitive via process optimization, reliability and gentle handling of printed products, even at highest press speeds. In addition, a digitalization initiative also included developing a key differentiation via data-driven services offers.
Case Study
Predictive Maintenance for Industrial Chillers
For global leaders in the industrial chiller manufacturing, reliability of the entire production process is of the utmost importance. Chillers are refrigeration systems that produce ice water to provide cooling for a process or industrial application. One of those leaders sought a way to respond to asset performance issues, even before they occur. The intelligence to guarantee maximum reliability of cooling devices is embedded (pre-alarming). A pre-alarming phase means that the cooling device still works, but symptoms may appear, telling manufacturers that a failure is likely to occur in the near future. Chillers who are not internet connected at that moment, provide little insight in this pre-alarming phase.
Case Study
Premium Appliance Producer Innovates with Internet of Everything
Sub-Zero faced the largest product launch in the company’s history:It wanted to launch 60 new products as scheduled while simultaneously opening a new “greenfield” production facility, yet still adhering to stringent quality requirements and manage issues from new supply-chain partners. A the same time, it wanted to increase staff productivity time and collaboration while reducing travel and costs.
Case Study
System 800xA at Indian Cement Plants
Chettinad Cement recognized that further efficiencies could be achieved in its cement manufacturing process. It looked to investing in comprehensive operational and control technologies to manage and derive productivity and energy efficiency gains from the assets on Line 2, their second plant in India.
Case Study
Integration of PLC with IoT for Bosch Rexroth
The application arises from the need to monitor and anticipate the problems of one or more machines managed by a PLC. These problems, often resulting from the accumulation over time of small discrepancies, require, when they occur, ex post technical operations maintenance.