企业身份解决方案为 Beckman Coulter 带来便利
技术
- 网络安全和隐私 - 身份认证管理
适用行业
- 生命科学
客户
贝克曼库尔特
关于客户
Beckman Coulter 总部位于加利福尼亚州布雷亚,生产可简化和自动化复杂生物医学测试的创新产品,在全球拥有 10,000 多名员工。
挑战
Beckman Coulter 希望实施一个单一因素的解决方案,以实现对企业网络的物理和远程逻辑访问。 Bechman Coulter 的用户携带智能卡门禁卡,但还需要一次性密码令牌才能在他们不在办公室时访问我们的公司网络。他们想简化流程。
解决方案
Beckman Coulter 决定采用基于 Gemalto IDPrime .NET 智能卡的一体化身份解决方案。该解决方案使 Beckman Coulter 的物理安全部门能够将所有必要的安全功能整合到一个方便的外形尺寸中,同时满足物理和逻辑安全访问需求。金雅拓的身份解决方案(包括 IDPrime .NET)允许公司控制对敏感区域(如产品开发和创新区)的访问,只有具有适当许可级别的员工才能访问。硬件组件 - IDPrime .NET
收集的数据
Access Control Status, Data Security, Employee Clearance, Human Resource Data , Security and access
运营影响
Case Study missing?
Start adding your own!
Register with your work email and create a new case study profile for your business.
相关案例.
Case Study
Embracing Business Success in Real Time
· Increase control over growing Big Data to improve business decisions · Manage data for 28,000 biotechnology stockkeeping units in the fields of microbiology, molecular biology, animal cell cultures, plant tissue cultures, and lab ware for laboratory chemicals · Accelerate report generation and analysis with real-time data
Case Study
Flow Robotics: Scaling Up Production and Accelerating Product Development with IoT
Flow Robotics, a Danish manufacturer, developed flowbot™ ONE pipetting robots to alleviate the strain on bioanalysts in life-science laboratories and hospitals across Europe. These robots were designed to automate part of the testing process, speeding up the time it takes to produce results and reducing pressure on staff. However, the company faced challenges in scaling up production and accelerating product development. High workloads and physically challenging conditions have long been an issue for laboratory professionals. Flow Robotics estimates that around half of medical lab technicians carry out the same arm movements for at least a quarter of their working day. The American Society for Clinical Pathology reported that 85% of laboratory professionals feel burnt out; 36% struggle with inadequate staffing; and 32% face a heavy workload and pressure to complete all testing on time.
Case Study
Revolutionizing Aerospace Industry with 3D Printing: A 63% Lighter Titanium Part
GE Aviation, a renowned name in the aerospace industry, recognized the potential of 3D printing technology in transforming the sector. The primary challenge was to reduce the weight of the aerospace parts, which would directly impact the fuel costs. A lighter airplane would mean lower fuel consumption, leading to cost savings and a smaller carbon footprint. However, achieving this weight reduction without compromising the strength and functionality of the parts was a significant challenge. Traditional manufacturing methods were not able to provide the desired weight reduction while maintaining the required stiffness and strength of the parts. The challenge was to find a solution that could create strong, light, and functional aerospace parts.
Case Study
Material Intelligence at Ethicon: Sustaining Medical Device Manufacturability and Improving Patient Care
Ethicon, a world-class medical devices company, faced several challenges in its operations. The rapid selection of manufacturing materials compliant in global markets was critical to assure patients, practitioners, and purchasing organizations of the biocompatibility of their medical devices. Ensuring supply chain continuity and minimizing risks of obsolescence for medical devices due to regulatory changes were also crucial in meeting Ethicon’s ongoing commitment to maintaining patient care. Furthermore, the engineers at Ethicon were developing the next generation of medical devices and needed to access historical material data to accelerate new product development. The process of centralizing and digitalizing its materials information was a significant challenge that Ethicon needed to overcome.
Case Study
IWT's Transformation: Customizing with Efficiency in IoT
IWT, a company specializing in the design, manufacture, and installation of washing systems for the life sciences and pharmaceutical industries, faced a significant challenge in managing its wide product portfolio. The company manufactures 45 different models, 60% of which are customized to some degree. This high level of customization, combined with limited production quantities, necessitated a controlled process for managing the release of engineering changes. The goal was to achieve efficiency, reduce process time, and better coordinate production throughout the organization. The need for strict compliance in heavily regulated industries further complicated the situation. IWT's existing PLM journey with Dassault Systèmes’ SOLIDWORKS for 3D CAD and Enovia for managing CAD data and Bills of Materials (BOMs) was proving inadequate. The system had limited part classification, no workflow, and no tool to ensure data consistency. The management of non-CAD documents was also a challenge, with information often difficult to find and access.
Case Study
Wireless Predictive Maintenance to Fix a Dated Walk-Around Program
C&W Services was using a manual condition monitoring program at one of its leading life sciences’ client up until last year. At best, data was collected manually every 30 days, even on the most critical machines, using a handheld data logger. After the data collection, all of the data analysis had to be outsourced to a third party for analysis. This approach has several limitations:1. Unplanned Downtime2. Shortage of Manpower3. Safety and Access to Machines4. Inconsistent Readings Collected by Manual Processes