技术
- 分析与建模 - 数字孪生/模拟
适用行业
- 汽车
- 设备与机械
- 食品与饮料
- 医疗保健和医院
适用功能
- 物流运输
- 流程制造
服务
- 硬件设计与工程服务
- 软件设计与工程服务
挑战
授权为多物理场仿真、电子设计自动化和 Faststream 的软件管理设计、模仿和验证的多路复用产品 - 跨各个领域,无需物理原型。 Faststream通过自动生成生成生产数字孪生的 PLC 代码来创建生产的数字化规划、模拟和优化。 Faststream 的数字孪生解决方案不断收到来自物理产品和生产设施的数据,从而引导新的认知。通过与 Mindsphere Faststream Technologies 的合作,我们将所有直觉反馈到完整的价值链中——直接反馈到产品设计中——生成一个完全封闭的决策循环,以在现实世界中持续优化生产和产品。
技术栈:
- 制造执行系统
- 机电一体化概念设计师
- 全集成自动化
- MindSphere
在石油和天然气公司:
客户端:
参与设计、制造石油和天然气行业尖端技术系统和产品的知名顾问之一。
跨海底、陆上/海上和地面项目的深厚能力。
问题:
客户希望实时了解早期生产系统的健康状况。
处理了更多信号,人工干预无法发现导致性能下降的异常情况。
由于缺乏传感器智能或设备检测,项目的产量和盈利能力下降。
解决方案
Case Study missing?
Start adding your own!
Register with your work email and create a new case study profile for your business.
相关案例.
Case Study
Smart Water Filtration Systems
Before working with Ayla Networks, Ozner was already using cloud connectivity to identify and solve water-filtration system malfunctions as well as to monitor filter cartridges for replacements.But, in June 2015, Ozner executives talked with Ayla about how the company might further improve its water systems with IoT technology. They liked what they heard from Ayla, but the executives needed to be sure that Ayla’s Agile IoT Platform provided the security and reliability Ozner required.
Case Study
IoT enabled Fleet Management with MindSphere
In view of growing competition, Gämmerler had a strong need to remain competitive via process optimization, reliability and gentle handling of printed products, even at highest press speeds. In addition, a digitalization initiative also included developing a key differentiation via data-driven services offers.
Case Study
Predictive Maintenance for Industrial Chillers
For global leaders in the industrial chiller manufacturing, reliability of the entire production process is of the utmost importance. Chillers are refrigeration systems that produce ice water to provide cooling for a process or industrial application. One of those leaders sought a way to respond to asset performance issues, even before they occur. The intelligence to guarantee maximum reliability of cooling devices is embedded (pre-alarming). A pre-alarming phase means that the cooling device still works, but symptoms may appear, telling manufacturers that a failure is likely to occur in the near future. Chillers who are not internet connected at that moment, provide little insight in this pre-alarming phase.
Case Study
Premium Appliance Producer Innovates with Internet of Everything
Sub-Zero faced the largest product launch in the company’s history:It wanted to launch 60 new products as scheduled while simultaneously opening a new “greenfield” production facility, yet still adhering to stringent quality requirements and manage issues from new supply-chain partners. A the same time, it wanted to increase staff productivity time and collaboration while reducing travel and costs.
Case Study
The Kellogg Company
Kellogg keeps a close eye on its trade spend, analyzing large volumes of data and running complex simulations to predict which promotional activities will be the most effective. Kellogg needed to decrease the trade spend but its traditional relational database on premises could not keep up with the pace of demand.
Case Study
Integration of PLC with IoT for Bosch Rexroth
The application arises from the need to monitor and anticipate the problems of one or more machines managed by a PLC. These problems, often resulting from the accumulation over time of small discrepancies, require, when they occur, ex post technical operations maintenance.