Schneider Electric > 实例探究 > Modernizing an airport’s electrical distribution from parking to departure

Modernizing an airport’s electrical distribution from parking to departure

Schneider Electric Logo
公司规模
Large Corporate
地区
  • Europe
国家
  • Switzerland
产品
  • EcoStruxure for Airports
  • SM6 air-insulated switchgear
  • RM6 switchgear
  • Easergy T200 Feeder Automation
  • Prisma PLV enclosure
技术栈
  • IoT
  • Cloud
  • Analytics
实施规模
  • Enterprise-wide Deployment
影响指标
  • Cost Savings
  • Productivity Improvements
  • Customer Satisfaction
技术
  • 分析与建模 - 实时分析
  • 功能应用 - 远程监控系统
  • 基础设施即服务 (IaaS) - 云计算
适用行业
  • 运输
适用功能
  • 设施管理
  • 物流运输
用例
  • 楼宇自动化与控制
  • 能源管理系统
  • 远程资产管理
服务
  • 系统集成
  • 云规划/设计/实施服务
关于客户
Geneva Airport is a world-class international airport located in Geneva, Switzerland. It is the second-largest airport in the country and serves 15 million passengers every year. Despite having only one runway, the airport is expected to handle over 25 million passengers by 2030. Geneva Airport prides itself on providing an enjoyable, efficient travel experience for its visitors. Amidst extensive expansion, it has preserved its responsive and efficient quality of service, bringing it to a larger, international passenger base. To accommodate its growing demand, Geneva Airport has been upgrading its infrastructure and renovating its terminals, cargo holds, and hangers.
挑战
Geneva Airport, the second-largest airport in Switzerland, has been experiencing an influx of passengers, necessitating its expansion. With only one runway, it serves 15 million passengers annually, a number expected to rise to over 25 million by 2030. This increase in traffic makes it essential to preserve the quality of the passenger experience at the airport. To accommodate its growing demand, Geneva Airport has been upgrading its infrastructure and renovating its terminals, cargo holds, and hangers. Alongside, the airport is improving its electrical distribution system. However, electrical renovation can create disruption, which can be critical in an airport as it not only creates delays for passengers but also impacts cargo and emergency operations where downtime is not an option.
解决方案
In 2011, Geneva Airport began its exclusive MEGA project (Modernization Electrical Geneva Airport) together with Schneider Electric. This began with a complete renovation and installation of a new medium voltage system from transformers to distribution equipment to monitoring software. The project also introduced low voltage cabinets throughout the site, which enabled airport staff to centralize all of their information and create accurate energy reports. Expansion can be expensive, and cost efficiency was also a top priority for the Geneva Airport team. Their goal was to improve the efficiency and safety of the airport’s on-site electrical distribution system, so they took the opportunity to also upgrade their control panels. Schneider Electric provided innovative and cost-effective solutions that ensure well executed, high-tech renovation, improving technology and passenger experience at the Geneva Airport without impacting day-to-day operations.
运营影响
  • Improvement of reliability with trustworthy innovative solutions
  • Cost-effective modernization using off-the-shelf products
  • Remote monitoring and control of substations
  • Integration with third-party software at the control center
  • Space savings with indoor switchgear

Case Study missing?

Start adding your own!

Register with your work email and create a new case study profile for your business.

Add New Record

相关案例.

联系我们

欢迎与我们交流!
* Required
* Required
* Required
* Invalid email address
提交此表单,即表示您同意 IoT ONE 可以与您联系并分享洞察和营销信息。
不,谢谢,我不想收到来自 IoT ONE 的任何营销电子邮件。
提交

感谢您的信息!
我们会很快与你取得联系。