公司规模
Large Corporate
地区
- Pacific
国家
- France
产品
- EcoStruxure for Electricity Companies
- AirSeT MV switchgear
- Minera transformer
- Easergy T300 remote terminal unit
- Easergy TH110 wireless thermal sensors
技术栈
- IoT-enabled system architecture
- ZigBee communication
- Remote monitoring
实施规模
- Pilot projects
影响指标
- Environmental Impact Reduction
- Digital Expertise
- Customer Satisfaction
技术
- 平台即服务 (PaaS) - 连接平台
适用行业
- 公用事业
适用功能
- 维护
- 物流运输
用例
- 远程资产管理
- 能源管理系统
- 预测性维护
服务
- 系统集成
- 云规划/设计/实施服务
关于客户
EEC Engie has been providing energy to the Caledonian territory for over 90 years, including to several municipalities in the Pacific islands of New Caledonia and the Loyalty Islands. The electrical distribution operator, a subsidy of the French multinational electric utility Engie Group, has more than 65,000 customers, from private customers, SMEs, and SMIs, to industrial companies. The Engie Group has long been committed to promoting sustainable development and offering zero-carbon integrated solutions. Island nations are one of the first areas to be affected by climate change. This makes reducing the use of traditional CO2-emitting energy sources and focusing on local, renewable energy sources particularly important for helping to improve the island’s selfsufficiency while also meeting local demand.
挑战
EEC Engie, an electric distribution utility based in New Caledonia, has a zero-carbon strategy. The company wants to remove the SF6 gas from its network. The remote island location presents difficult and unique challenges for EEC Engie. New Caledonia is halfway around the world from Engie’s French operations base. This means that EEC Engie not only needs to manage the purchasing part of its business, but also logistics and the complexity of transportation -- all of which must be taken into account in order to be efficient. Recycling SF6 is also complicated in New Caledonia because the island does not currently have channels for reprocessing SF6. The medium has been used in electrical equipment for decades. While it is very effective for insulating and breaking, it is also harmful to the environment because it is a potent greenhouse gas.
解决方案
The electrical distribution operator partnered with Schneider Electric to deploy an SF6-free sustainable solution that delivers improved reliability. The answer was an innovative, green, and smart substation: new air-insulated AirSeT MV switchgear and the new connected Minera transformer that uses biodegradable vegetable oil -- both connected to the Easergy T300 remote terminal unit. Schneider Electric offered a more ecological and intelligent substation. Located in Nouméa, the capital of New Caledonia, the green EcoStruxure-ready substation uses innovative new SF6-free MV switchgear technology combined with a connected new generation transformer. The equipment is capable of exchanging data with EEC Engie’s energy management control system, an essential element for deploying the smart grid – all with a minimal ecological footprint.
运营影响
Case Study missing?
Start adding your own!
Register with your work email and create a new case study profile for your business.
相关案例.
Case Study
IoT Solutions for Smart City | Internet of Things Case Study
There were several challenges faced: It is challenging to build an appliance that can withstand a wide range of voltage fluctuations from as low at 90v to as high as 320v. Since the device would be installed in remote locations, its resilience was of paramount importance. The device would have to deal with poor network coverage and have the ability to store and re-transmit data if networks were not available, which is often the case in rural India. The device could store up to 30 days of data.
Case Study
Automation of the Oguz-Gabala-Baku water pipeline, Azerbaijan
The Oguz-Gabala-Baku water pipeline project dates back to plans from the 1970’s. Baku’s growth was historically driven by the booming oil industry and required the import of drinking water from outside of the city. Before the construction of the pipeline, some 60 percent of the city’s households received water for only a few hours daily. After completion of the project, 75 percent of the two million Baku residents are now served around the clock with potable water, based on World Health Organization (WHO) standards. The 262-kilometer pipeline requires no pumping station, but uses the altitude differences between the Caucasian mountains and the capital to supply 432,000 m³/d to the Ceyranbatan water reservoir. To the people of Baku, the pipeline is “the most important project not only in 2010, but of the last 20 years.”
Case Study
GPRS Mobile Network for Smart Metering
Around the world, the electricity supply industry is turning to ‘smart’ meters to lower costs, reduce emissions and improve the management of customer supplies. Smart meters collect detailed consumption information and using this feedback consumers can better understand their energy usage which in turn enables them to modify their consumption to save money and help to cut carbon emissions. A smart meter can be defined in many ways, but generally includes an element of two-way communication between the household meter and the utility provider to efficiently collect detailed energy usage data. Some implementations include consumer feedback beyond the energy bill to include online web data, SMS text messages or an information display in consumers’ premises. Providing a cost-effective, reliable communications mechanism is one of the most challenging aspects of a smart meter implementation. In New Zealand, the utilities have embraced smart metering and designed cost effective ways for it to be implemented. The New Zealand government has encouraged such a move to smart metering by ensuring the energy legislation is consistent with the delivery of benefits to the consumer while allowing innovation in this area. On the ground, AMS is a leader in the deployment of smart metering and associated services. Several of New Zealand’s energy retailers were looking for smart metering services for their residential and small business customers which will eventually account for over 500,000 meters when the multi-year national deployment program is concluded. To respond to these requirements, AMS needed to put together a solution that included data communications between each meter and the central data collection point and the solution proposed by Vodafone satisfied that requirement.
Case Study
NB-IoT connected smart meters to improve gas metering in Shenzhen
Shenzhen Gas has a large fleet of existing gas meters, which are installed in a variety of hard to reach locations, such as indoors and underground, meaning that existing communications networks have struggled to maintain connectivity with all meters. The meter success rate is low, data transmissions are so far unstable and power consumption is too high. Against this background, Shenzhen Gas, China Telecom, Huawei, and Goldcard have jointly trialed NB-IoT gas meters to try and solve some of the challenges that the industry faces with today’s smart gas meters.
Case Study
OneWireless Enabled Performance Guarantee Test
Tata Power's power generation equipment OEMs (M/s BHEL) is required to provide all of the instrumentation and measurement devices for conducting performance guarantee and performance evaluation tests. M/s BHEL faced a number of specific challenges in conducting PG tests: employing high-accuracy digital communications for instrumentation, shortening setup and dismantling time, reducing hardware required, making portable instrument setup, avoiding temporary cabling work and the material waste costs
Case Study
British Gas Modernizes its Operations with Innovative Smart Metering Deployment
The UK government has mandated that smart meters are rolled out as standard across Great Britain by end of 2020, and this roll-out is estimated to create £14 billion in net benefits to the UK in consumer energy savings and lower energy generation demand, according to the Oxford Economics report, “The Value of Smart Metering to Great Britain.” While smart-metering systems have been deployed in many countries, the roll-out in Great Britain is unique because it is led by energy retailers, who have responsibility for the Electricity and Gas meters. The decision to have a retailer-led roll out was made by DECC (Department of Energy and Climate Change) to improve customer experience and drive consumer benefits. It has also led to some unique system-level requirements to support the unique local regulatory model.