技术
- 应用基础设施与中间件 - 中间件、SDK 和库
- 处理器与边缘智能 - 微控制器与印刷电路板 (PCB)
适用行业
- 航天
- 设备与机械
适用功能
- 维护
- 产品研发
用例
- 时间敏感网络
服务
- 硬件设计与工程服务
- 系统集成
关于客户
Granite Summit Designs 是一家小型 PCB 设计公司,专门为商业、工业、航空航天和国防等各个行业提供定制 PCB。创始人 Matt Lightsey 是一位经验丰富的电气工程师,他希望为他的单人设计公司提供全面且价格实惠的 PCB 设计工具。
挑战
小型 PCB 设计公司面临的最大挑战之一是经济实惠的软件工具的限制。电气工程师通常无法访问允许他们在开发周期的每个阶段进行设计、共同设计和采购零件或共享项目的综合系统。许多可用的工具通常是不完整的,需要额外的模块,这会成倍地增加复杂性和成本。
解决方案
Granite Summit Designs 的创始人兼首席设计师 Matt Lightsey 改用 Altium Designer,这是一款功能全面、价格实惠的一体化工具。 Altium Designer 提供专业 PCB 设计所需的所有功能,且价格不高。此外,基于云的平台 Altium 365 可提供无缝设计体验并连接工程桌面工具。
运营影响
数量效益
Case Study missing?
Start adding your own!
Register with your work email and create a new case study profile for your business.
相关案例.
Case Study
Smart Water Filtration Systems
Before working with Ayla Networks, Ozner was already using cloud connectivity to identify and solve water-filtration system malfunctions as well as to monitor filter cartridges for replacements.But, in June 2015, Ozner executives talked with Ayla about how the company might further improve its water systems with IoT technology. They liked what they heard from Ayla, but the executives needed to be sure that Ayla’s Agile IoT Platform provided the security and reliability Ozner required.
Case Study
IoT enabled Fleet Management with MindSphere
In view of growing competition, Gämmerler had a strong need to remain competitive via process optimization, reliability and gentle handling of printed products, even at highest press speeds. In addition, a digitalization initiative also included developing a key differentiation via data-driven services offers.
Case Study
Predictive Maintenance for Industrial Chillers
For global leaders in the industrial chiller manufacturing, reliability of the entire production process is of the utmost importance. Chillers are refrigeration systems that produce ice water to provide cooling for a process or industrial application. One of those leaders sought a way to respond to asset performance issues, even before they occur. The intelligence to guarantee maximum reliability of cooling devices is embedded (pre-alarming). A pre-alarming phase means that the cooling device still works, but symptoms may appear, telling manufacturers that a failure is likely to occur in the near future. Chillers who are not internet connected at that moment, provide little insight in this pre-alarming phase.
Case Study
Premium Appliance Producer Innovates with Internet of Everything
Sub-Zero faced the largest product launch in the company’s history:It wanted to launch 60 new products as scheduled while simultaneously opening a new “greenfield” production facility, yet still adhering to stringent quality requirements and manage issues from new supply-chain partners. A the same time, it wanted to increase staff productivity time and collaboration while reducing travel and costs.
Case Study
Integration of PLC with IoT for Bosch Rexroth
The application arises from the need to monitor and anticipate the problems of one or more machines managed by a PLC. These problems, often resulting from the accumulation over time of small discrepancies, require, when they occur, ex post technical operations maintenance.
Case Study
Airbus Soars with Wearable Technology
Building an Airbus aircraft involves complex manufacturing processes consisting of thousands of moving parts. Speed and accuracy are critical to business and competitive advantage. Improvements in both would have high impact on Airbus’ bottom line. Airbus wanted to help operators reduce the complexity of assembling cabin seats and decrease the time required to complete this task.