Turning waste into green energy

Schneider Electric Logo
公司规模
Large Corporate
地区
  • Europe
国家
  • France
产品
  • EcoStruxure Service Plan
  • EcoStruxure Asset Advisor
  • RM6 and SM6 switchgear
技术栈
  • IoT
  • Data Analytics
  • Remote Monitoring
实施规模
  • Enterprise-wide Deployment
影响指标
  • Productivity Improvements
  • Environmental Impact Reduction
技术
  • 平台即服务 (PaaS) - 连接平台
适用行业
  • 回收与废物管理
  • 公用事业
适用功能
  • 维护
  • 质量保证
用例
  • 能源管理系统
  • 预测性维护
服务
  • 系统集成
  • 数据科学服务
关于客户
Azalys is a waste treatment plant located in Carrières-sous-Poissy, France. It is responsible for the management and recovery of urban waste in 23 Yvelines municipalities in the Paris region. The plant is operated by a Suez subsidiary, Helyseo, and belongs to the Valoseine intermunicipal syndicate. Serving an area inhabited by almost 300,000 people, Azalys treats 125,000 metric tons of waste and produces 40 GWh of electricity per year. The plant incinerates non-recyclable waste and transforms the heat into steam, which is then converted by a turbo alternator into energy. Some of this energy is consumed by the site itself, while the rest is sold to the electricity distribution network Enedis.
挑战
Azalys, a waste treatment plant in Carrières-sous-Poissy, France, needed to modernize its electrical system while ensuring continuous service for local communities. The plant, which serves an area inhabited by almost 300,000 people, treats 125,000 metric tons of waste and produces 40 GWh of electricity per year. The plant incinerates non-recyclable waste and transforms the heat into steam, which is then converted by a turbo alternator into energy. Some of this energy is consumed by the site itself, while the rest is sold to the electricity distribution network Enedis. The health of the electrical equipment is crucial to the plant’s mission. The modernization process had to be as swift as possible in order not to interrupt the service provided to the local communities.
解决方案
The modernization project involved installing state-of-the-art RM6 and SM6 switchgear in place of FluoKit units, which were later recycled. The new switchgear is equipped with sensors that measure the temperature and humidity in the modules. This information is collected and sent to the EcoStruxure platform, then analyzed and interpreted by Schneider Electric’s Connected Service Hub experts, enabling preventive and predictive maintenance. In addition, substation data, reports, and maintenance recommendations can be consulted in real-time via the mySchneider portal. With timely alerts on equipment issues and support from Schneider Electric field services in fixing them, the facility can minimize the risk of downtime.
运营影响
  • System modernization performed in four days, synchronized with the annual production shutdown
  • Implementation of predictive maintenance to ensure the continuity of waste treatment and energy production services
  • Timely alerts on equipment issues and support from Schneider Electric field services in fixing them, the facility can minimize the risk of downtime
数量效益
  • The plant treats 125,000 metric tons of waste and produces 40 GWh of electricity per year
  • The modernization process was completed in under four days

Case Study missing?

Start adding your own!

Register with your work email and create a new case study profile for your business.

Add New Record

相关案例.

联系我们

欢迎与我们交流!
* Required
* Required
* Required
* Invalid email address
提交此表单,即表示您同意 IoT ONE 可以与您联系并分享洞察和营销信息。
不,谢谢,我不想收到来自 IoT ONE 的任何营销电子邮件。
提交

感谢您的信息!
我们会很快与你取得联系。