技术
- 平台即服务 (PaaS) - 应用开发平台
适用行业
- 设备与机械
- 金融与保险
用例
- 库存管理
- 人员跟踪与监控
关于客户
新西兰事故赔偿公司 (ACC) 成立于 1974 年,旨在帮助预防伤害,并为该国 480 万居民和海外游客提供人身伤害保险。该组织很复杂,承担着一系列相互关联的流程。 2016 年,ACC 对所有员工进行了调查,以寻找改进的机会。该组织的 3,500 名员工每年积极处理超过 200 万起索赔。
挑战
新西兰的事故赔偿公司 (ACC) 是一个复杂的组织,承担一系列相互关联的流程。为了支持持续改进,ACC 希望加强其流程文档和管理。该组织正在寻求一种解决方案,以确保其员工能够轻松访问并找到其角色所需的信息。此外,ACC 希望确保信息是最新的且易于理解。 2016 年,ACC 对所有员工进行了一项调查,以确定改进的机会。该组织还热衷于促进积极的流程文化和一致的决策。
解决方案
在评估了市场上的一系列流程和数据管理工具后,ACC 决定于 2017 年初部署 Nintex Promapp。Nintex Promapp 的部署遵循分阶段方法,包括初始设计、推出,然后全面生产。在该平台得到更广泛的应用之前,最初的测试是由一个小团队完成的。然后在 Nintex Promapp 中记录和完善关键流程。随着 Nintex Promapp 的部署和功能齐全,很快就发现了显着的优势。该工具为员工提供了掌控流程、根据需要进行更改以及回答其他员工提出的任何问题的机会。
运营影响
数量效益
Case Study missing?
Start adding your own!
Register with your work email and create a new case study profile for your business.
相关案例.
Case Study
Smart Water Filtration Systems
Before working with Ayla Networks, Ozner was already using cloud connectivity to identify and solve water-filtration system malfunctions as well as to monitor filter cartridges for replacements.But, in June 2015, Ozner executives talked with Ayla about how the company might further improve its water systems with IoT technology. They liked what they heard from Ayla, but the executives needed to be sure that Ayla’s Agile IoT Platform provided the security and reliability Ozner required.
Case Study
IoT enabled Fleet Management with MindSphere
In view of growing competition, Gämmerler had a strong need to remain competitive via process optimization, reliability and gentle handling of printed products, even at highest press speeds. In addition, a digitalization initiative also included developing a key differentiation via data-driven services offers.
Case Study
Predictive Maintenance for Industrial Chillers
For global leaders in the industrial chiller manufacturing, reliability of the entire production process is of the utmost importance. Chillers are refrigeration systems that produce ice water to provide cooling for a process or industrial application. One of those leaders sought a way to respond to asset performance issues, even before they occur. The intelligence to guarantee maximum reliability of cooling devices is embedded (pre-alarming). A pre-alarming phase means that the cooling device still works, but symptoms may appear, telling manufacturers that a failure is likely to occur in the near future. Chillers who are not internet connected at that moment, provide little insight in this pre-alarming phase.
Case Study
Premium Appliance Producer Innovates with Internet of Everything
Sub-Zero faced the largest product launch in the company’s history:It wanted to launch 60 new products as scheduled while simultaneously opening a new “greenfield” production facility, yet still adhering to stringent quality requirements and manage issues from new supply-chain partners. A the same time, it wanted to increase staff productivity time and collaboration while reducing travel and costs.
Case Study
Integration of PLC with IoT for Bosch Rexroth
The application arises from the need to monitor and anticipate the problems of one or more machines managed by a PLC. These problems, often resulting from the accumulation over time of small discrepancies, require, when they occur, ex post technical operations maintenance.
Case Study
Robot Saves Money and Time for US Custom Molding Company
Injection Technology (Itech) is a custom molder for a variety of clients that require precision plastic parts for such products as electric meter covers, dental appliance cases and spools. With 95 employees operating 23 molding machines in a 30,000 square foot plant, Itech wanted to reduce man hours and increase efficiency.