适用行业
- 电网
- 设备与机械
用例
- 网状网络
- 时间敏感网络
服务
- 系统集成
关于客户
Energomash Group Enterprises 是俄罗斯领先的电力设备制造商。该公司从事广泛的业务,包括开发和制造各种类型的电站和泵设备。除此之外,Energomash 还经营自己的燃气轮机工厂,并从事电力和热能的开发。该公司以其对创新和质量的承诺而闻名,不断寻求改进流程并为客户提供更好的产品和服务的方法。他们在网格生成方面面临的挑战证明了他们对持续改进的承诺以及采用新技术来增强运营的意愿。
挑战
Energomash Group Enterprises 是俄罗斯最大的电力设备制造商之一,其运营面临着重大挑战。该公司从事各类电站和泵设备的开发和制造,以及运营自己的燃气轮机工厂以及开发电力和热能,需要改进其网格发电流程。此过程的要求包括构建可适应所研究过程的特殊性的定性网格结构、与 CAD 系统集成以及减少典型问题的网格结构构建所需的时间。
解决方案
Energomash 决定使用 ANSYS ICEM CFD Hexa 来应对他们的挑战。该解决方案使他们能够应用适合实际区域的完全六面体结构。它还提供与 CAD 系统的直接接口,从而提高了流程的准确性和效率。此外,对几何不同但拓扑接近的模型使用相同的块结构显着减少了为典型问题创建网格结构所需的时间。该解决方案是应对 Energomash 面临的挑战的综合方法,满足他们的每个要求并提供更高效的网格生成流程。
运营影响
数量效益
Case Study missing?
Start adding your own!
Register with your work email and create a new case study profile for your business.
相关案例.
Case Study
Smart Water Filtration Systems
Before working with Ayla Networks, Ozner was already using cloud connectivity to identify and solve water-filtration system malfunctions as well as to monitor filter cartridges for replacements.But, in June 2015, Ozner executives talked with Ayla about how the company might further improve its water systems with IoT technology. They liked what they heard from Ayla, but the executives needed to be sure that Ayla’s Agile IoT Platform provided the security and reliability Ozner required.
Case Study
IoT enabled Fleet Management with MindSphere
In view of growing competition, Gämmerler had a strong need to remain competitive via process optimization, reliability and gentle handling of printed products, even at highest press speeds. In addition, a digitalization initiative also included developing a key differentiation via data-driven services offers.
Case Study
Predictive Maintenance for Industrial Chillers
For global leaders in the industrial chiller manufacturing, reliability of the entire production process is of the utmost importance. Chillers are refrigeration systems that produce ice water to provide cooling for a process or industrial application. One of those leaders sought a way to respond to asset performance issues, even before they occur. The intelligence to guarantee maximum reliability of cooling devices is embedded (pre-alarming). A pre-alarming phase means that the cooling device still works, but symptoms may appear, telling manufacturers that a failure is likely to occur in the near future. Chillers who are not internet connected at that moment, provide little insight in this pre-alarming phase.
Case Study
Premium Appliance Producer Innovates with Internet of Everything
Sub-Zero faced the largest product launch in the company’s history:It wanted to launch 60 new products as scheduled while simultaneously opening a new “greenfield” production facility, yet still adhering to stringent quality requirements and manage issues from new supply-chain partners. A the same time, it wanted to increase staff productivity time and collaboration while reducing travel and costs.
Case Study
Integration of PLC with IoT for Bosch Rexroth
The application arises from the need to monitor and anticipate the problems of one or more machines managed by a PLC. These problems, often resulting from the accumulation over time of small discrepancies, require, when they occur, ex post technical operations maintenance.
Case Study
Robot Saves Money and Time for US Custom Molding Company
Injection Technology (Itech) is a custom molder for a variety of clients that require precision plastic parts for such products as electric meter covers, dental appliance cases and spools. With 95 employees operating 23 molding machines in a 30,000 square foot plant, Itech wanted to reduce man hours and increase efficiency.