技术
- 传感器 - 电表
适用行业
- 设备与机械
用例
- 库存管理
- 时间敏感网络
服务
- 系统集成
- 培训
关于客户
Genesis Energy 是新西兰一家国有电力、天然气和液化石油气生产商和零售商。它为商业和住宅客户提供服务,使其成为该国最大的能源零售商。该公司拥有 670,000 名客户群,员工超过 1,000 名。 Genesis Energy 在多个地理位置开展业务,这导致其流程存在很大差异。该公司致力于持续改进,并采用精益和六西格码业务方法。
挑战
Genesis Energy 是新西兰一家国有电力、天然气和液化石油气发电商和零售商,当它决定将其外部承包的联络中心纳入内部时,面临着重大挑战。在这一转型过程中,该公司面临着失去宝贵的企业知识的风险。此外,Genesis Energy 正在努力解决其流程的复杂性,这些流程通常包括低级和高级步骤的混合,没有明确的界限。该公司还必须应对多个地理位置的流程的巨大差异,从而导致不一致和低效率。面临的挑战是获取和保留企业知识、简化和标准化流程以及消除区域差异。
解决方案
Genesis Energy 求助于流程管理软件 Nintex Promapp 来应对这些挑战。 Nintex Promapp 的实施相对简单,培训和支持团队指导项目组完成必要的步骤。该软件最初用于获取联络中心的知识,后来推广到贸易和批发业务、健康和安全以及 IT 部门。 Nintex Promapp 与精益和六西格码业务方法的兼容性是一个显着的优势。该软件使 Genesis Energy 将其流程简化为七到八个步骤,在不同级别之间提供了明确的划分。它还为所有办事处提供单一来源来回答他们的疑问并了解如何做事,从而帮助消除地区差异。此外,Nintex Promapp 的灵活性使其能够进行定制以记录任何流程场景,展示了其在不同业务领域的适用性。
运营影响
数量效益
Case Study missing?
Start adding your own!
Register with your work email and create a new case study profile for your business.
相关案例.
Case Study
Smart Water Filtration Systems
Before working with Ayla Networks, Ozner was already using cloud connectivity to identify and solve water-filtration system malfunctions as well as to monitor filter cartridges for replacements.But, in June 2015, Ozner executives talked with Ayla about how the company might further improve its water systems with IoT technology. They liked what they heard from Ayla, but the executives needed to be sure that Ayla’s Agile IoT Platform provided the security and reliability Ozner required.
Case Study
IoT enabled Fleet Management with MindSphere
In view of growing competition, Gämmerler had a strong need to remain competitive via process optimization, reliability and gentle handling of printed products, even at highest press speeds. In addition, a digitalization initiative also included developing a key differentiation via data-driven services offers.
Case Study
Predictive Maintenance for Industrial Chillers
For global leaders in the industrial chiller manufacturing, reliability of the entire production process is of the utmost importance. Chillers are refrigeration systems that produce ice water to provide cooling for a process or industrial application. One of those leaders sought a way to respond to asset performance issues, even before they occur. The intelligence to guarantee maximum reliability of cooling devices is embedded (pre-alarming). A pre-alarming phase means that the cooling device still works, but symptoms may appear, telling manufacturers that a failure is likely to occur in the near future. Chillers who are not internet connected at that moment, provide little insight in this pre-alarming phase.
Case Study
Premium Appliance Producer Innovates with Internet of Everything
Sub-Zero faced the largest product launch in the company’s history:It wanted to launch 60 new products as scheduled while simultaneously opening a new “greenfield” production facility, yet still adhering to stringent quality requirements and manage issues from new supply-chain partners. A the same time, it wanted to increase staff productivity time and collaboration while reducing travel and costs.
Case Study
Integration of PLC with IoT for Bosch Rexroth
The application arises from the need to monitor and anticipate the problems of one or more machines managed by a PLC. These problems, often resulting from the accumulation over time of small discrepancies, require, when they occur, ex post technical operations maintenance.
Case Study
Robot Saves Money and Time for US Custom Molding Company
Injection Technology (Itech) is a custom molder for a variety of clients that require precision plastic parts for such products as electric meter covers, dental appliance cases and spools. With 95 employees operating 23 molding machines in a 30,000 square foot plant, Itech wanted to reduce man hours and increase efficiency.