技术
- 应用基础设施与中间件 - 中间件、SDK 和库
- 其他 - 电池
适用行业
- 塑料
- 回收与废物管理
用例
- 库存管理
- 减废预测
客户
诺德森
关于客户
Nordsense提供端到端的智能废物管理解决方案。它帮助市政当局、城市和废物运营商优化废物服务并过渡到可持续实践。
挑战
根据世界银行集团的数据,全球每年产生 20.1 亿吨城市固体废物。传统的废物管理效率极低,80% 的废物收集时间不正确。迟到的废物收集会导致:
- 溢出的垃圾箱
- 不卫生的环境
- 市民投诉
- 非法倾销
- 增加清洁和收集成本
早期的废物收集会导致不必要的碳排放,并增加交通拥堵和运营成本。
解决方案
凭借 Nordsense 技术成功的关键连接性,该公司审查了五家 4G 物联网模块供应商。 Telit 是最佳选择。
Telit 提供的硬件和全球连接服务对 Nordsense 的顺利运营至关重要。这一点以及泰利特在我们的集成过程使他们成为高度信任的合作伙伴很久之后继续提供的出色的开发人员支持。
运营影响
Case Study missing?
Start adding your own!
Register with your work email and create a new case study profile for your business.
相关案例.
Case Study
Plastic Spoons Case study: Injection Moulding
In order to meet customer expectations by supplying a wide variety of packaging units, from 36 to 1000 spoons per package, a new production and packaging line needed to be built. DeSter wanted to achieve higher production capacity, lower cycle time and a high degree of operator friendliness with this new production line.
Case Study
Boiler Control System for Plastic Manufacturing Applications
Factory automation applications must be equipped to handle and monitor the myriads of information from attached devices. For plastic manufacturing applications, the boiler control system plays a critical role by gathering and regulating information to ensure production is accurate and smooth. In this particular case, the customer combines eight subsystems that include power meters, water meters, alarm output, displays, and I/O status to be controlled by several intelligent controllers with Modbus RTU interface. The Modbus TCP protocol is used for this application due to the distance. System Requirements: • Modbus serial to Modbus TCP translation • Multiple slaves/masters support • Automatic Modbus TCP response time detection
Case Study
Ascend Performance Materials Case Study
Ascend operations must access multiple software systems to manage day-to-day operations in an effective and secure manner. These systems generate large sets of data which contain critical information pertaining to management systems, planning and cost information in business systems and energy consumption. As a result, Ascend management was challenged with creating relevant reports reflecting performance measures in overall context of their operational process. The company’s previous process entailed collecting and analyzing data manually which was not effective, since the information collected was generated after the fact, and was too complex for collaborative use across the organization.
Case Study
Water Treatment Energy Management
Water pumping, treatment and conveyance are among the largest energy and cost outlays for many local and regional municipalities. Electricity time-of-use rates and peak pricing tariffs are driving those costs even higher. This case study describes how Monterey Regional Water Pollution Control Agency (MRWPCA) implemented a process data monitoring and control solution in order to analyze and optimize energy use, reduce deployment costs and save operational expenses.
Case Study
Remake Enterprise-to-production System
The client was running a legacy material flow tracking system and wanted to replace the system with a more effective one as the system was increasingly expensive to maintain and support and also was not extendable. The client's IT landscape was filled with modern applications and it was difficult to interface the material flow tracking system with modern applications.