技术
- 分析与建模 - 机器学习
- 分析与建模 - 实时分析
适用行业
- 教育
- 设备与机械
用例
- 预测性维护
- 实时定位系统 (RTLS)
服务
- 数据科学服务
关于客户
TripActions 是一家企业旅行管理组织,帮助控制商务旅行成本并通过轻松获得的商务旅行机会激励员工。
挑战
TripActions 的基础设施和数据存储解决方案无法满足分析数据容量和可扩展性需求,导致数据孤岛并增加总体拥有成本。历史数据从未被清理过,而分析数据以不同格式存储在各种数据库中,从而创建了多个数据孤岛,并使数据无法用于分析和机器学习。现有的数据解决方案在分析能力和可扩展性方面失败,增加了运营成本并抑制了业务增长。
解决方案
Provectus 通过使用 AWS 产品迁移和合并历史数据,为实时流数据管道提供了统一的解决方案。他们在 Apache Kafka 之上构建了一个实时流解决方案,用于数据摄取、处理、丰富和转换。数据流设计为自动存储在 Amazon S3 和 AWS Glue 之上的数据湖中,并针对 Amazon Athena 的亚秒级查询进行了优化。现有平台的历史数据已迁移到单独的数据湖,以确保分析和机器学习的数据一致性和可用性。
运营影响
数量效益
Case Study missing?
Start adding your own!
Register with your work email and create a new case study profile for your business.
相关案例.
Case Study
Smart Water Filtration Systems
Before working with Ayla Networks, Ozner was already using cloud connectivity to identify and solve water-filtration system malfunctions as well as to monitor filter cartridges for replacements.But, in June 2015, Ozner executives talked with Ayla about how the company might further improve its water systems with IoT technology. They liked what they heard from Ayla, but the executives needed to be sure that Ayla’s Agile IoT Platform provided the security and reliability Ozner required.
Case Study
IoT enabled Fleet Management with MindSphere
In view of growing competition, Gämmerler had a strong need to remain competitive via process optimization, reliability and gentle handling of printed products, even at highest press speeds. In addition, a digitalization initiative also included developing a key differentiation via data-driven services offers.
Case Study
Predictive Maintenance for Industrial Chillers
For global leaders in the industrial chiller manufacturing, reliability of the entire production process is of the utmost importance. Chillers are refrigeration systems that produce ice water to provide cooling for a process or industrial application. One of those leaders sought a way to respond to asset performance issues, even before they occur. The intelligence to guarantee maximum reliability of cooling devices is embedded (pre-alarming). A pre-alarming phase means that the cooling device still works, but symptoms may appear, telling manufacturers that a failure is likely to occur in the near future. Chillers who are not internet connected at that moment, provide little insight in this pre-alarming phase.
Case Study
Premium Appliance Producer Innovates with Internet of Everything
Sub-Zero faced the largest product launch in the company’s history:It wanted to launch 60 new products as scheduled while simultaneously opening a new “greenfield” production facility, yet still adhering to stringent quality requirements and manage issues from new supply-chain partners. A the same time, it wanted to increase staff productivity time and collaboration while reducing travel and costs.
Case Study
Integration of PLC with IoT for Bosch Rexroth
The application arises from the need to monitor and anticipate the problems of one or more machines managed by a PLC. These problems, often resulting from the accumulation over time of small discrepancies, require, when they occur, ex post technical operations maintenance.
Case Study
Robot Saves Money and Time for US Custom Molding Company
Injection Technology (Itech) is a custom molder for a variety of clients that require precision plastic parts for such products as electric meter covers, dental appliance cases and spools. With 95 employees operating 23 molding machines in a 30,000 square foot plant, Itech wanted to reduce man hours and increase efficiency.