技术
- 分析与建模 - 数字孪生/模拟
适用行业
- 设备与机械
适用功能
- 产品研发
- 质量保证
用例
- 快速原型制作
- 虚拟原型与产品测试
服务
- 系统集成
- 测试与认证
关于客户
透博梅卡隶属于赛峰集团,是世界领先的直升机发动机生产商。自 1938 年成立以来,该公司已生产了 70,000 多台发动机。透博梅卡专门从事为直升机提供动力的中低功率燃气轮机的设计、生产、销售和支持。他们致力于设计新发动机,以符合行业标准和直升机制造客户的创新。
挑战
透博梅卡是一家领先的直升机发动机生产商,在开发运行每个发动机系列控制系统的嵌入式软件方面面临着挑战。他们采用的基于模型的设计方法使用仿真工具进行快速原型设计、软件测试和验证。然而,这种方法需要耗时的手动编码,这可能会导致编码错误以及代码和模型之间的不一致。为了跟上直升机技术的新创新步伐并保持符合 DO-178B/C 标准,透博梅卡需要能够帮助他们更有效地编码、减少错误并改进代码管理的工具。
解决方案
为了应对这些挑战,透博梅卡工程师开发了 G4 软件流程。该过程包括需求管理、基于模型的设计、仿真、测试自动化和合格的代码生成。他们将 SCADE Suite 纳入流程中,因为它具有高效的模型检查器,这使他们能够运行模拟测试用例并在设计阶段的早期检测问题。该套件的可重用符号库促进了软件项目内部和跨软件项目的重用和设计一致性。它还使软件团队能够使用相同的正式语言和方法,从而有助于减少开发时间和成本。
运营影响
数量效益
Case Study missing?
Start adding your own!
Register with your work email and create a new case study profile for your business.
相关案例.
Case Study
Smart Water Filtration Systems
Before working with Ayla Networks, Ozner was already using cloud connectivity to identify and solve water-filtration system malfunctions as well as to monitor filter cartridges for replacements.But, in June 2015, Ozner executives talked with Ayla about how the company might further improve its water systems with IoT technology. They liked what they heard from Ayla, but the executives needed to be sure that Ayla’s Agile IoT Platform provided the security and reliability Ozner required.
Case Study
IoT enabled Fleet Management with MindSphere
In view of growing competition, Gämmerler had a strong need to remain competitive via process optimization, reliability and gentle handling of printed products, even at highest press speeds. In addition, a digitalization initiative also included developing a key differentiation via data-driven services offers.
Case Study
Predictive Maintenance for Industrial Chillers
For global leaders in the industrial chiller manufacturing, reliability of the entire production process is of the utmost importance. Chillers are refrigeration systems that produce ice water to provide cooling for a process or industrial application. One of those leaders sought a way to respond to asset performance issues, even before they occur. The intelligence to guarantee maximum reliability of cooling devices is embedded (pre-alarming). A pre-alarming phase means that the cooling device still works, but symptoms may appear, telling manufacturers that a failure is likely to occur in the near future. Chillers who are not internet connected at that moment, provide little insight in this pre-alarming phase.
Case Study
Premium Appliance Producer Innovates with Internet of Everything
Sub-Zero faced the largest product launch in the company’s history:It wanted to launch 60 new products as scheduled while simultaneously opening a new “greenfield” production facility, yet still adhering to stringent quality requirements and manage issues from new supply-chain partners. A the same time, it wanted to increase staff productivity time and collaboration while reducing travel and costs.
Case Study
Integration of PLC with IoT for Bosch Rexroth
The application arises from the need to monitor and anticipate the problems of one or more machines managed by a PLC. These problems, often resulting from the accumulation over time of small discrepancies, require, when they occur, ex post technical operations maintenance.
Case Study
Robot Saves Money and Time for US Custom Molding Company
Injection Technology (Itech) is a custom molder for a variety of clients that require precision plastic parts for such products as electric meter covers, dental appliance cases and spools. With 95 employees operating 23 molding machines in a 30,000 square foot plant, Itech wanted to reduce man hours and increase efficiency.