技术
- 功能应用 - 车队管理系统 (FMS)
- 网络与连接 - 路由器和网桥
适用行业
- 汽车
- 设备与机械
适用功能
- 物流运输
用例
- 车队管理
- 车辆性能监测
服务
- 系统集成
- 培训
客户
马车集团
关于客户
Stagecoach Group是一家位于苏格兰珀斯的苏格兰运输集团。它在英国经营巴士、快车和电车服务。它以前在非洲、亚洲、欧洲大陆、北美和大洋洲开展过广泛的业务。它在伦敦证券交易所上市。
挑战
在过去十年中,Stagecoach 的主要目标之一是提高其运营的可持续性,包括显着减少其车队运输的二氧化碳排放量。首次启动减排计划时,Stagecoach 将目标设定为 3%。
认识到实现这样一个雄心勃勃的目标的难度,Stagecoach 求助于 GreenRoad 来提供所需的工具。此外,它希望使用 GreenRoad 平台能够降低油耗,减少车辆磨损,并提高乘客的舒适度和安全性。
解决方案
Stagecoach 在 116 个站点的公交车上部署了 GreenRoad,并通过培训计划、持续监控和激励计划为其提供支持。 “我们的管理人员开始利用 GreenRoad 的实用工具来识别和根除怠速和其他燃料浪费行为。这转化为油耗和碳排放的立即额外减少,加上我们开始在车辆磨损方面的节省——例如通过延长制动器的使用寿命。乘客在更顺畅的旅程中补充了司机。”
运营影响
数量效益
Case Study missing?
Start adding your own!
Register with your work email and create a new case study profile for your business.
相关案例.
Case Study
Smart Water Filtration Systems
Before working with Ayla Networks, Ozner was already using cloud connectivity to identify and solve water-filtration system malfunctions as well as to monitor filter cartridges for replacements.But, in June 2015, Ozner executives talked with Ayla about how the company might further improve its water systems with IoT technology. They liked what they heard from Ayla, but the executives needed to be sure that Ayla’s Agile IoT Platform provided the security and reliability Ozner required.
Case Study
IoT enabled Fleet Management with MindSphere
In view of growing competition, Gämmerler had a strong need to remain competitive via process optimization, reliability and gentle handling of printed products, even at highest press speeds. In addition, a digitalization initiative also included developing a key differentiation via data-driven services offers.
Case Study
Predictive Maintenance for Industrial Chillers
For global leaders in the industrial chiller manufacturing, reliability of the entire production process is of the utmost importance. Chillers are refrigeration systems that produce ice water to provide cooling for a process or industrial application. One of those leaders sought a way to respond to asset performance issues, even before they occur. The intelligence to guarantee maximum reliability of cooling devices is embedded (pre-alarming). A pre-alarming phase means that the cooling device still works, but symptoms may appear, telling manufacturers that a failure is likely to occur in the near future. Chillers who are not internet connected at that moment, provide little insight in this pre-alarming phase.
Case Study
Premium Appliance Producer Innovates with Internet of Everything
Sub-Zero faced the largest product launch in the company’s history:It wanted to launch 60 new products as scheduled while simultaneously opening a new “greenfield” production facility, yet still adhering to stringent quality requirements and manage issues from new supply-chain partners. A the same time, it wanted to increase staff productivity time and collaboration while reducing travel and costs.
Case Study
Integration of PLC with IoT for Bosch Rexroth
The application arises from the need to monitor and anticipate the problems of one or more machines managed by a PLC. These problems, often resulting from the accumulation over time of small discrepancies, require, when they occur, ex post technical operations maintenance.
Case Study
Robot Saves Money and Time for US Custom Molding Company
Injection Technology (Itech) is a custom molder for a variety of clients that require precision plastic parts for such products as electric meter covers, dental appliance cases and spools. With 95 employees operating 23 molding machines in a 30,000 square foot plant, Itech wanted to reduce man hours and increase efficiency.